- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
smis修改(smis修改)
smis修改(smis修改)
1. using a statement to change the monthly time will cause the schedule to be significantly larger than the completion time
2. order generation, no matter what the quoted currency, the quoted amount is the same as the local currency
3. select vendor cannot save YCYD013007, YCYD013008
4., when approval, the quotation reached the next leadership approval, but the approval amount can not reach, and need further approval, need to be modified: REHL913002
5. the application form returned on board was modified for the first time (should not be modified)
6. diesel engine gear difference measurement record table units to change (please see the sea September 26th report), up and down with the line, do not use the solid line, the ship may not have color film printing
7. application form with attachments
8. sign, the company will show different quantities
9. oil management, input date, input often incorrect
10. The quotation cannot be cancelled by the locomotive after the quotation
11. for approval, the number of approval should be approved by the number of processes
12., the approval should be to retain the last persons information
13. approval information loss (oil management)
The 15. segment information, ship back, voyage information is wrong
16. voyage fuel consumption and monthly fuel consumption mixed together, can not be distinguished
17. the supplier of the purchasing selection and the old rail shall not show the approval process
18. Huaihai data, old rail is not displayed
The 19. oceans marine version can display the data on the ship, while the web version does not show
20. where are the logbook and deck logs displayed in the company?
21. thermal management - Boiler statements, the time required to lock, or else the company version of the page can not see
22. material spare parts inventory report needs approval
24., the ship version certificate expired, there is no reminder, the certificate renewal time should be changed to the next replacement time
25.
您可能关注的文档
- bnb(泡泡堂).doc
- bom断阶原则(Bom断阶原则).doc
- bodyshop(美体小铺).doc
- bonecore男性增高(Bonecore males are increased).doc
- bot项目成功运作的关键因素(Key factors for successful operation of BOT project).doc
- bb缺铁和锌(BB iron deficiency and zinc).doc
- b脱盐水题库--判断(B demineralized water test bank - Judgement).doc
- boost.log在boost1.47下的编译总结(Boost.log summary of the compilation under boost1.47).doc
- c 编译程序的内存占用区(The memory footprint of the C compiler).doc
- c 程序设计初步(C programming preliminary).doc
- smt品质(SMT quality).doc
- smt岗位操作规范(SMT post operation specification).doc
- smt程式管理规范(SMT program management specification).doc
- socket原理及编程(Socket principles and programming).doc
- solaris下压缩解压缩命令详解(Solaris compression decompression command detailed).doc
- solaris用户命令中英文对照参考(Solaris user command in English and Chinese reference).doc
- spa按摩松弛身心妙法(Spa massage to relax the).doc
- smt防错料问题(SMT error proofing material).doc
- sqlite3.7.8 vc2010编译说明(Sqlite3.7.8 vc2010 compilation instructions).doc
- sql优化(SQL optimization).doc
最近下载
- 0102、U9 cloud供应链-采购管理.pptx VIP
- 0301、U9 cloud财务-基础知识.pptx VIP
- 人员培训记录表格(表格模板DOC格式).docx VIP
- 02-全员培训-U9cloud全产品介绍.pptx VIP
- 音乐鉴赏:器乐知识及作品鉴赏PPT教学课件.pptx VIP
- 0305、U9 cloud财务-成本核算.pptx VIP
- SL 640-2013 输变电项目水土保持技术规范.pdf
- 福建省厦门市同安区第一中学2024-2025学年七年级上学期期中质量检测英语试题.docx VIP
- 0303、U9 cloud财务-应收管理.pptx VIP
- 0201、U9 cloud生产管理-领域知识.pptx VIP
文档评论(0)