网站大量收购独家精品文档,联系QQ:2885784924

175839_造价师口诀(175839_ cost division formula).doc

175839_造价师口诀(175839_ cost division formula).doc

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
175839_造价师口诀(175839_ cost division formula)

175839_造价师口诀(175839_ cost division formula) One, remind 1, 09 of the fees deleted engineering quota measurement fees. 2, the cost of measures (environmental protection fees, civilized construction costs, safety construction fees, temporary facilities fees) merged into safe and civilized construction costs. Concrete, reinforced concrete formwork and scaffolding support fees, charges into a professional project (measures of concrete and reinforced concrete formwork and frame construction fee is listed as professional project measures; scaffolding fee is listed as construction engineering, decoration engineering and municipal engineering professional measures project). Increased construction costs (during winter and rainy seasons) and fees for temporary protection facilities on ground, underground facilities and buildings. Construction drainage, precipitation fees split into (construction drainage fee, construction precipitation fee). In addition: the night construction increased fees, two times transportation costs, large machinery and equipment import and export field and security fees, the project has been completed and equipment protection fees have not changed. Two, measures fee 1, increase the winter rain tonight night increased construction costs, increased construction costs in winter and rainy season Professional large machinery two times handling professional measures project \ large machinery and equipment import and export field and security fee \ two handling fee The ground and underground buildings need to protect the temporary protection facilities on the ground, underground facilities and buildings Drainage work has also been completed construction, drainage fees \ construction, precipitation fees \ finished project and equipment protection fees Measures to ensure safety and civilization are guaranteed, and measures such as safety and civilized construction fees can be kept in mind 2 and two moving expenses Winter winter rainy season increased construct

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档