- 1、本文档共32页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
175839_造价师口诀(175839_ cost division formula)
175839_造价师口诀(175839_ cost division formula)
One, remind
1, 09 of the fees deleted engineering quota measurement fees.
2, the cost of measures (environmental protection fees, civilized construction costs, safety construction fees, temporary facilities fees) merged into safe and civilized construction costs.
Concrete, reinforced concrete formwork and scaffolding support fees, charges into a professional project (measures of concrete and reinforced concrete formwork and frame construction fee is listed as professional project measures; scaffolding fee is listed as construction engineering, decoration engineering and municipal engineering professional measures project).
Increased construction costs (during winter and rainy seasons) and fees for temporary protection facilities on ground, underground facilities and buildings.
Construction drainage, precipitation fees split into (construction drainage fee, construction precipitation fee).
In addition: the night construction increased fees, two times transportation costs, large machinery and equipment import and export field and security fees, the project has been completed and equipment protection fees have not changed.
Two, measures fee
1, increase the winter rain tonight night increased construction costs, increased construction costs in winter and rainy season
Professional large machinery two times handling professional measures project \ large machinery and equipment import and export field and security fee \ two handling fee
The ground and underground buildings need to protect the temporary protection facilities on the ground, underground facilities and buildings
Drainage work has also been completed construction, drainage fees \ construction, precipitation fees \ finished project and equipment protection fees
Measures to ensure safety and civilization are guaranteed, and measures such as safety and civilized construction fees can be kept in mind
2 and two moving expenses
Winter winter rainy season increased construct
您可能关注的文档
- (txt版本的)2010-2011学年第一学期形势与政策课免费答案((txt version) free answer for the first semester of the 2010-2011 academic year).doc
- (pmu专稿)援外工程项目施工监理((PMU) construction supervision of foreign aid project).doc
- (广州)检测技术有限公司-岛津_2011830324120051((Guangzhou) Testing Technology Co., Ltd. - SHIMADZU _2011830324120051).doc
- (必读)图片简介((required) picture introduction).doc
- (二)以顾客满意为目标,完善服务质量的管理((two) with customer satisfaction as the goal, improve the quality of service management).doc
- (新版)轮胎翻新技术制造工艺专利大全全文文集((New Edition) tire retreading technology, manufacturing technology patent, Daquan, full text).doc
- (扩词)识字1—课文26((expansion) literacy 1 - text 26).doc
- (二)、人物故事((two) character stories).doc
- (世袭金银财富金银争霸)如何做一名成功的黄金操盘手((hereditary gold and silver wealth, gold and silver contend for hegemony) how to be a successful gold trader).doc
- (精)麦肯锡提案标准流程((standard) McKinsey proposal standard process).doc
文档评论(0)