初学预算要记住的数据(Data to remember in the beginner budget)
初学预算要记住的数据(Data to remember in the beginner budget)
Data to remember in the beginner budget
I. The amount of concrete used in ordinary residential buildings and the amount of steel used:
1, multi story masonry house:
Reinforcement: 30KG/m2
Concrete: 0.3 ~ 0.33m3/m2
2, multi layer frame:
Reinforcement: 38 ~ 42KG/m2
Concrete: 0.33 ~ 0.35m3/m2
3, small high-level 11~12:
Reinforcement: 50 ~ 52KG/m2
Concrete: 0.35m3/m2
4, 17~18 floors:
Reinforcement: 54 ~ 60KG/m2
Concrete: 0.36m3/m2
5, 30 meters high, H=94 meters:
Reinforcement: 65 ~ 75KG/m2
Concrete: 0.42 ~ 0.47m3/m2
6, high-rise hotel style apartment 28 H=90 meters:
Reinforcement: 65 ~ 70KG/m2
Concrete: 0.38 ~ 0.42m3/m2
7 villa: the amount of concrete and the amount of steel between multi-storey masonry residential and high-rise 11~12 layers;
The above data are designed according to the seismic 7 degree zone rule
Two, ordinary multi-storey residential building construction budget economic indicators
1, outdoor doors and windows (excluding units, doors, security doors) area of 0.20 to 0.24 of the construction area
2, the template area accounts for about 2.2 of the floor area
3, the outdoor plastering area accounts for about 0.4 of the floor area
4, indoor plastering area accounted for 3.8 of the floor area
Three, construction efficiency
1, a plastering worker, plastering 35 square meters a day
2, a brick, 1000~1800 bricks a day
3, a brick, 800~1000 bricks a day hollow bricks
4, ceramic tile 15 square metre
5, scraping the first 300 square meters / day, second times 180 square meters / day, third times the pressure of 90 square meters / day
Four. Basic data
1 、 concrete weight 2500KG/m3
2, the weight per meter of reinforced 0.00617 * D * D
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, one cubic meter of red brick about 525 pieces (wall thickness)
6, one cubic meter of hollow brick about 175
7, sieve one side clean sand, 1.3 square ordinary sand
Construction program song
Want to buil
您可能关注的文档
- 二级c上机编程答案※※a※b……题型(Two level C programming on the answer of a a B...... Questions).doc
- 二级vf2(Level two vF2).doc
- 二级c语言上机考试评分原理分析(Analysis on scoring principle of two level C language examination).doc
- 二年级记事作文(Grade two writing notes).doc
- 二级办公软件解题ppt(Two level office software problem solving ppt).doc
- 二级学科代码(Two level discipline code).doc
- 二头肌训练理论(Two head training theory).doc
- 二级建筑师答题(Level two architect answer).doc
- 二级翻译经验谈(Two levels of translation experience).doc
- 二胡演奏技法 揉弦(The erhu playing techniques of vibrato).doc
- 海南省专升本招生考试《生理学》考试大纲.docx
- 2024-2025学年九年级下学期数学开学摸底考试题(人教版)含答案.pdf
- 2024-2025学年八年级道德与法治下学期开学摸底考试题含答案.pdf
- 2024-2025学年八年级地理下学期开学摸底考试题含答案.pdf
- 2024-2025学年八年级生物下学期开学摸底考试题含答案.pdf
- 2024-2025学年八年级下学期开学摸底考数学试题含答案.pdf
- 2024-2025学年八年级下学期数学开学摸底考试题(人教版)含答案.pdf
- 2024-2025学年八年级下学期英语开学摸底考试题含答案.pdf
- 辽宁省沈阳市2025届高三上学期教学质量检测(一)英语试卷含答案.docx
- 2024-2025学年九年级历史下学期开学摸底考试题含答案.pdf
文档评论(0)