- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
对钢筋分项工程的质量控制(Quality control of reinforced concrete project)
对钢筋分项工程的质量控制(Quality control of reinforced concrete project)
Steel project is the main engineering structure safety, so the whole project for the reinforcement project is the priority among priorities. As the engineer of the project site, reinforcement project quality is one of the key points of supervision.
- and raw materials control
Steel as the double control material , according to the concrete construction quality acceptance (GB50204 - 2002) specified in the 5.2.1 clause, reinforced approach, according to the current national standard hot rolled ribbed steel reinforced concrete the provisions of article GB1499 according to the samples taken as mechanical performance test, the quality must meet the relevant standards, so steel raw materials should pay attention to several aspects of the inspection and acceptance:
As the engineer of 1. steel comes into play, should be reinforced and reinforced materials factory warranty batch number iron card compared to see whether. Note that each bundle shall be reinforced iron card, but also pay attention to the information on the number of factory warranty is greater than the number of entry, otherwise should not be admitted, so as to eliminate fake reinforced with engineering approach.
2. reinforced approach, should be in the same grade, the same specifications, the same stove number, the weight of each batch from a group of not more than 60t. Also allowed by the same method, the same smelting casting method of different furnace tank number of mixed batch, but the carbon content of furnace tank number difference is not greater than 0.02%, manganese content difference is not greater than 0.15%, the weight of each batch of not more than 60 tons of sampling in a group. It is reasonable to approach the steel bar test qualified steel used in engineering.
Two, the steel processing control
Often do not pay attention to on-site supervision engineer control of steel processing process, but wait until the scene reinforced after the i
您可能关注的文档
- 城市更新中的混合开发策略应用(Application of hybrid development strategy in urban renewal).doc
- 城市污水处理(Municipal Wastewater Treatment).doc
- 城市环境地图(Urban environmental map).doc
- 场地平整工程进度控制(Progress control of site leveling project).doc
- 城市破损山体修复与绿化景观营建技术(Construction technology of urban damaged mountain restoration and greening landscape).doc
- 城中小学数学学科教研工作计划(Program for teaching and research of mathematics in urban primary school).doc
- 城市规划相关知识精讲班第3讲讲义(Urban planning related knowledge, lectures, lectures, lectures, third).doc
- 城市规划管理与法规精讲班第10讲讲义(Urban planning management and regulations lecture class tenth Lecture Notes).doc
- 城市规划管理与法规精讲班第12讲讲义(Urban planning management and regulations lecture class twelfth Lecture Notes).doc
- 城市规划管理与法规精讲班第32讲讲义(Urban planning management and regulations lecture class thirty-second Lecture Notes).doc
- 对食品添加剂的认识-利弊(Understanding of food additives - pros and cons).doc
- 导游考试名词解释(Explanation of tour guide examination term).doc
- 对折现率性质的界定(Definition of the nature of discount rate).doc
- 导热油在粗苯加氢精制工艺中的应用(Application of heat conducting oil in crude benzol hydrofining process).doc
- 对社会舆论监督必要性的认识(Understanding of the necessity of supervision by public opinion).doc
- 对电梯和消防联动的一些认识(Some understanding of elevator and fire linkage).doc
- 导致电脑网速过慢的原因详解(Causes the computer network speed to be too slow to explain).doc
- 导致网速变慢的8种情况(8 cases that lead to slower network speed).doc
- 导致企业决策失误的五企业培训个因素(Five enterprise training factors leading to enterprise decision making errors).doc
- 导出图层设置 revit(Export layer settings Revit).doc
文档评论(0)