phc管桩的施工工艺(Construction technology of PHC pipe pile).docVIP

phc管桩的施工工艺(Construction technology of PHC pipe pile).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
phc管桩的施工工艺(Construction technology of PHC pipe pile)

phc管桩的施工工艺(Construction technology of PHC pipe pile) 1. Process flow This project uses PHC pipe pile, static pressure method construction, its construction process is slightly temporary two, the implementation of quality standards (this pile foundation project) GBJ202 - 83 code for construction and acceptance of foundations and foundations JGJ94 - 94 technical code for pile foundations of buildings GBJ301 - 88 standards for quality inspection and evaluation of building works DBJ/T15-22-98 technical specification for prestressed concrete pipe pile foundation (Guangdong standard) Three, quality control points and pre project: 1. the supervisor shall control the following quality control points Prevent pile inclination and deviation Prevent pile top crushing Ensure the pile end conditions meet the design requirements The fabrication of prestressed pipe pile should meet the requirements of design and specification 2. supervision personnel by the following content as pre project Construction plan: construction schedule, construction sequence of piles; Stacking site: flat and solid, good foundation, drainage smooth; Quality inspection of pile foundation: according to quality standard; Checking pile position: checking the plane position of pile position. Four 、 construction preparation 1 construction site engineering geological data and necessary hydrogeological data. 2 pile foundation engineering construction drawings (including the same unit in all engineering drawings of pile foundation) and can be used as the basis for construction. 3 survey data of underground pipelines (pipes, cables) in construction sites and adjacent areas. 4, carefully check the performance of each component of the piling equipment to ensure normal operation. 5 construction organization design or construction plan of pile foundation engineering. 6 cement, sand, gravel, reinforcement, admixture and other raw materials and their products quality inspection report. 7 test reference data on load and c

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档