- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FT TEST SWITCH ElectroMeters(英国《金融时报》测试开关静电计)
FT TEST SWITCH
FT TEST SWITCH AND TEST PLUG
APPLICATION
The ITI Type Test Switches and Test Plugs provide a safe, simple, fast and reliable method to isolate and
service installed equipment.
KEY Benefits
The FT Switches and FT Test Plugs have all the features necessary for applications involving the
measurement of individual currents and voltages to facilitate testing of substation instrumentation
and protection devices from the front of the panel. The make-before-break current short circuit
feature also allows test personnel to test quickly and safely.
The FT Switch is built with a maximum of ten individual poles, or switch units.
The switches can be assembled in a variety of different arrangements to match customer
requirements.
ITI FT Test plugs are used in conjunction with the FT Switches to enable easy measurement,
calibration, verification or maintenance of relay, meters and instruments.
Voltage measurements can also be made directly on the FT Switch without disturbing existing
connections. There is a test clip provision located on the top of each pole that allows connection with stan-
dard spring clip test leads.
Protection
With the cover in place, a meter type seal can be placed through either of the cover studs of the
FT Switch to prevent unauthorized access to the switch. As an additional feature, a clear cover is
available that can be installed and locked with the switchblades in the open or closed position.
SPECIFICATIONS
Rating
The standard FT Switches is rated at 600 volts and 30 amps. The Switch meets or exceeds all
requirements of ANSI/IEEE Standard C37.90.
Mounting
FT Switch are designed for semi-flush mounting on the front of switchboard panels, facilitating
inspection and accessibility.
Drilling Plan - Inches
Net Shipping
Weig
您可能关注的文档
- Fatigue Strength Prediction Formulae for Steels (钢的疲劳强度预测公式).pdf
- Fault Ride Through Effects on Alternators (断层度过对发电机的影响).pdf
- Fault Tree Analysis CRGRAPH(故障树分析CRGRAPH).pdf
- Fatigue Failure Analysis of a GreaseLubricated (GreaseLubricated的疲劳失效分析).pdf
- FB0172 Ball Screw 150 dpi Joyce Dayton(FB0172滚珠螺杆150 dpi乔伊斯代顿).pdf
- Fatigue UPRM(疲劳UPRM).pdf
- FE Simulation of Thin Strip and Temper Rolling (有限元模拟薄带和脾气).pdf
- FE Reference 82.1104web College of (铁学院82.1104 web引用).pdf
- FE1.1 USB 2.0 H SPEED 4PORT H CONTROLLER(FE1.1 USB 2.0 H速度4端口H控制器).pdf
- Feasibility of IMO Annex VI Tier III (国际海事组织第三附件第六层的可行性).pdf
- FSG 31GP QISTBIRUTION STATEMENT A (最为31 gp QISTBIRUTION声明).pdf
- FThetaPowerRonar Lenses Linos(FThetaPowerRonar镜头Linos).pdf
- FT, MT, RT GE Grid Solutions(英国《金融时报》,太,RT通用网格解决方案).pdf
- FTYPE CUP TESTERS ASSEMBLIES OPERATION (FTYPE杯测试人员装配操作).pdf
- FUEL CELL BASICS Pragma Industries(燃料电池基础知识编译指示产业).pdf
- Fuel Cells The Electrochemical Society(燃料电池的电化学的社会).pdf
- Fuel Supply Pumps LNG Home ACD(液化天然气燃料供给泵ACD回家).pdf
- Fuel filter with fuel pressure regulator (燃油滤器与燃油压力调节器).pdf
- Fuelling the next generation OPITO(推动下一代OPITO).pdf
- Fujikura 19S Fusion Splicer Fiber Optic(Fujikura 19 s熔接光纤).pdf
文档评论(0)