FullDepth Precast Concrete Bridge Deck (FullDepth预制混凝土桥面)
Full-Depth Precast Concrete Bridge Deck Construction
John R. Fowler, P.Eng., President
Canadian Precast/Prestressed Concrete Institute
Paper prepared for presentation
at the Bridges – Links to a Sustainable Future Session
of the 2088 Annual Conference of the
Transportation Association of Canada
Toronto, Ontario
1
ABSTRACT
An alternate to cast-in-place bridge decks are prefabricated, full-depth precast
concrete deck panels. These panels can be constructed off-site under controlled
conditions in a precast plant and brought to the bridge site ready to be installed
and connected. This requires significantly less on-site construction work and
ensures minimum traffic interference. In many urban situations, a bridge can be
rebuilt using night or weekend closures or staged construction to maintain traffic
in both directions. The benefits of precast full-depth bridge deck panels include:
durable high quality materials; minimal on-site construction and traffic disruption;
increased safety for construction crews and the public; and minimal adverse
economic impact due to road closures.
This paper summarizes many of the findings in a “State-of-the-Art Report on Full
Depth Precast Concrete Bridge Deck Panels” [1]. This report will be published by
the Precast / Prestressed Concrete Institute (PCI) later this year.
INTRODUCTION
Some regulatory authorities are willing to pay a premium to minimize interference
with traffic during construction. Traffic holdups also have an adverse impact on
the environment. Many bridge deck replacement projects using full-depth precast
bridge decks have demonstrated significant reductions in construction time,
reduced impacts on traffic flow, as well as good performance. The use of precast
bridge decks dates back to the early 1960’s.
Precast deck systems have been
您可能关注的文档
- FedEx Express Caribbean Transportation Solutions(联邦快递快递加勒比运输解决方案).pdf
- Fermi Surfaces and Metals Illinois State University(费米表面和金属伊利诺斯州立大学).pdf
- FERROHYDRODYNAMICS GBV(FERROHYDRODYNAMICS GBV).PDF
- Feynman Diagrams for Beginners unizg.hr(为初学者unizg.hr费曼图).pdf
- Ferraris Acceleration Sensor Principle and Field (法拉利加速度传感器原理和字段).pdf
- FH16 4x2 High tractor rear air susp. Volvo Trucks(susp FH16 4 x2高拖拉机后方空气。).pdf
- Femtosecond micro and nanomachining of (飞秒微和nanomachining).pdf
- FF SSANDSANDS PPROCESSINGROCESSING (FF SSANDSANDS PPROCESSINGROCESSING).pdf
- Fenton’s Reagent for the Treatment of (芬顿试剂的治疗).pdf
- FIBER OPTIC DISPLACEMENT SENSORS(光纤位移传感器).pdf
- 2025届衡阳市第八中学高三一诊考试物理试卷含解析.doc
- 2025届湖南省娄底市双峰一中等五校重点中学高三第二次诊断性检测物理试卷含解析.doc
- 天水市第一中学2025届高三第二次联考物理试卷含解析.doc
- 2025届金华市重点中学高三考前热身物理试卷含解析.doc
- 2025届北京市石景山区第九中学高三第四次模拟考试物理试卷含解析.doc
- 江苏扬州市2025届高三第一次模拟考试物理试卷含解析.doc
- 2025届江苏省南通市高级中学高考物理五模试卷含解析.doc
- 广东省清远市华侨中学2025届高三第一次调研测试物理试卷含解析.doc
- 辽宁省凤城市2025届高三第五次模拟考试物理试卷含解析.doc
- 内蒙古巴彦淖尔市重点中学2025届高考仿真卷物理试卷含解析.doc
文档评论(0)