Sample Drawing Package for One and Two (抽样方案1和2).pdf

Sample Drawing Package for One and Two (抽样方案1和2).pdf

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Sample Drawing Package for One and Two (抽样方案1和2)

Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx Common checklists for 1 2 Family Dwellings: • New construction – Outright One or Two Family Dwelling • Addition/Renovation/Alteration - One Family Dwellings in RS Zones • Decks in RS Zones Please note: The drawings contained in this document are to be used as examples only. DOC/2012/082228 Updated September 2012 General notes: Pencil drawings or notations are not acceptable. ** Ensure that an area 8 x 11.5 is left blank on the site plans for the Engineering Dept. sticker ** Calculations of Energy Utilization must be provided for all new house applications. Spatial Separation Calculations must be provided with the drawings, as well as Floor Space Ratio Statement (above grade FSR and maximum). A Site Coverage Statement must be provided as well as an Impermeable Material Site Coverage Statement with a detailed breakdown, if the building is located in a Zoning District that requires it. If the building site is located in a known peat bog area or in an area where the soil is subject to liquefaction due to an earthquake or in a flood plain area, a soils report from a Geotechnical Engineer is also required, stating the soil type and conditions as well as a recommendation of the type of foundations, footings and excavation details required for that particular site. Signed sealed B1/B2 letters of assurance for Geotechnical items must accompany the soils report. A signed statement from the Structural Engineer must on the B1/B2 letter, (or a separate letter signed and sealed by the Professional Engineer) indicating that he has read the Geotechnical report and that the building has been de

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档