- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Selling Windows Azure ProjectsInfrastructure(销售Windows Azure ProjectsInfrastructure)
Selling Windows Azure Projects
IT INFRASTRUCTURE
A GUIDE FOR MICROSOFT SI PARTNERS
Sponsored by Microsoft Corporation
1/ Why Should You Sell Infrastructure Projects that Use Windows Azure?
2/ Why Sell Projects on Windows Azure Rather than Another Cloud Platform?
3/ How Do You Handle Common Objections?
4/ Scenarios: What to Sell
5/ Comparing Scenarios: Revenue Potential vs. Difficulty of Sale
For systems integrators who sell As the figure below shows, Windows Azure
gives your customers an alternative to their
infrastructure projects, the rise of
own datacenter: on-demand access to
cloud computing brings big changes. virtual machines and storage in Microsoft
If you sell services such as installing datacenters around the world. Just as
important, customers pay for VMs by the
and managing physical servers,
hour and storage by the day. There’s no up-
deploying networks, and configuring front investment in hardware and no
email and other on-premises commitment.
applications, public clouds will shrink This is a big change in how your customers
use and pay for computing. The
demand for all of these. What should
infrastructure projects you sell are bound to
you be selling instead? change, too.
One answer is to sell infrastructure projects
that use a public cloud platform. These
projects are different from what you’ve
been doing, but there is certainly still a role
for infrastructure-oriented SIs in the cloud
era.
This guide describes how to sell
infrastru
您可能关注的文档
- Section 3 Sanitary Sewer Laterals (第三节卫生下水道侧根).pdf
- Section 3.4 Knauf Insulation(3.4节可耐福保温).pdf
- Section 3 Manual Transmissions Testroete(第三节手工传输Testroete).pdf
- SECTION 23 08 00 COMMISSIONING OF HVAC (节23日08年00暖通空调的调试).pdf
- Section 3.4 Basic Results of Graph Theory(3.4节图论的基本结果).pdf
- Section 3.7 Optimization Problems Florida (3.7节佛罗里达优化问题).pdf
- Section 4 Knauf Insulation UK(英国第四节可耐福保温).pdf
- Section 4 Flanges AAP Industries(第四节法兰AAP产业).pdf
- Section 4 Manual Transaxles Testroete(第四节体力的驱动桥Testroete).pdf
- Section 4 – Power Transformer Design TI(第四部分u2014u2014电力变压器设计).pdf
文档评论(0)