焦化工艺流程(Coking process).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
焦化工艺流程(Coking process)

焦化工艺流程(Coking process) Brief introduction of coking process 4.1 coal preparation workshop The task of the coal preparation system is to provide qualified raw coal for the coke oven. The range is from the beginning of the coal yard to coke coal seam has been tajia. Including raw materials coal blending, grinding and transportation operations. In the coal preparation system, the coal blending system is used for the coal blending with electronic automatic proportioning scale. The capacity of the coal preparation system is designed according to the production capacity of the tamping coke oven with an annual output of 1 million tons of coke. The capacity of the feeding system is 300t/h, and the capacity of the coal blending pulverizing system is 300 t/h, and the amount of clean coal for the coke oven is 145.15t/h. Brief description of the process: the coking coal is transported by car and unloaded manually. Coal with different coal turns on coal; coal loader, bulldozer or the raw coal into the coal by the corresponding period by reciprocating feeder (M80501A-F) will pit under the coal into the 1 belt conveyor (A80501), the 2 and 3 belt conveyor sent to the coal bunker coal unloading in the storage of coal bunker. Electronic automatic weighing coal bunker under various coal according to the proportion corresponding to match, the Deferrizater iron coal into the crushing workshop of PCFK1618 reversible hammer crusher for crushing, fine coal is to 3mm accounted for more than 90%, of which 1mm accounted for more than 50%, then the preparation of 4, 5 and preparation 6 belt conveyor belt conveyor and the reversible warehouse into the coal tower for coke oven use. See the process flow chart of the coal preparation. The system adopts the combination of PLC control and local operation Coke oven, coke quenching and ground dust removal station Coke oven coking workshop selected 2 x 72 hole type ZHJL4350D wide chamber, double flue, exhaust gas recirculation, jet and single heating t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档