- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢骨(Steel)
钢骨(Steel)
It is assumed that the axial force due to overturning moment of the shear wall directly bears the horizontal seismic shear force that can not be directly transmitted to the ground shear wall. Thus, the internal forces of the frame columns supported below the transfer floor are much larger than the results of the calculation analysis. The following measures are adopted:
1. Within the scope of the tower, the steel frame under the five storey and the reinforced concrete beam mixed structure (48 reinforced concrete columns) are used. As an important measure to solve the problem of high level switching and high overrun.
2, A, B tower podium floor roof panel, in tower of high mode, under longitudinal tensile pressure subjected to repeated and transverse shear stress is very complex. At the same time, due to the functional requirements of building use, opening a large hole in the central podium to set the elevator on the floor, greatly weakened. In view of this unfavorable factor, measures are taken to strengthen the section and reinforcement of the floor beam at the big hole, to increase the thickness of the floor and to add oblique reinforcement.
3, because the upper house is a butterfly plane, there are two transition beams in the individual parts of the transfer floor. According to clause 10.2.10 of the technical specification for concrete structures of high-rise buildings (JGJ3-2002), the vertical lateral resistance members (walls and columns) at the upper part of the transfer floor shall be directly placed on the main structure of the transfer floor. When the vertical arrangement of the structure is complex, the main beam supporting the shear wall and supporting the transition secondary beam and the upper shear wall, stress analysis should be carried out, the reinforcement should be checked according to the stress, and the reinforcement construction measures should be strengthened. It is difficult to adopt the frame supported main and secondary beam schemes
您可能关注的文档
- 辽宁省教育心理学知识点总结(Summary of knowledge points of educational psychology in Liaoning).doc
- 边境牧羊犬如何喂养和训练和照顾(How do the border dogs feed and train and take care of them).doc
- 输液器材及主动输液(Infusion equipment and active infusion).doc
- 达芬奇家具造假门与经营诚信缺失(Da Vinci furniture false gate and lack of business integrity).doc
- 达芬奇家具造假门企业培训与经营诚信缺失(Da Vinci furniture false gate enterprise training and management lack of good faith).doc
- 迅速学跳机械舞(Learn to dance quickly).doc
- 过劳信号(Over work signal).doc
- 过孔设置(Through-hole setting).doc
- 过敏体质要点注意(Allergies, points, attention).doc
- 过敏反应 -(Anaphylaxis -).doc
- 钩藤(Rhynchophylla).doc
- 钱志亮(Zhi Liang Qian).doc
- 钳工基础知识试题一(Locksmith basic knowledge test questions).doc
- 钳工试题2(Fitter's question 2).doc
- 钻头规格(bit size).doc
- 钴_镍萃取分离原理与方法_肖超(_ cobalt nickel extraction separation principle and method of _ Xiao Chao).doc
- 钢筋计算的方法(Method for reinforcing steel bar calculation).doc
- 钱钟书《围城》的语言艺术(The language art of Qian Zhongshu's besieged city).doc
- 铁砂掌之练习方法(Practice sand palm method).doc
- 铁的分类(Classification of iron).doc
最近下载
- 八年级上名著《红岩》第10章(讲练测).docx VIP
- 表面处理技术在高端装备制造中的应用与挑战报告2025.docx
- 汪曾祺《钓鱼大夫》阅读答案试题解析理解 .pdf VIP
- 家庭反暴强制报告制度及服务流程.docx VIP
- 聚醚多元醇企业标准.pdf VIP
- 八年级上名著《红岩》第11章(讲练测).docx VIP
- T_CIATCM 093—2020_基层医疗卫生机构中医诊疗区(中医馆)团体标准远程会诊系统建设指南中国中医药信息学会.pdf VIP
- 八年级上名著《红岩》第12章(讲练测).docx VIP
- 2025国投生物制造创新研究院有限公司招聘(31人)考试备考试题及答案解析.docx VIP
- 边坡位移监测记录表.xlsx VIP
文档评论(0)