工作日记2-17起(Work diary 2-17 onwards).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工作日记2-17起(Work diary 2-17 onwards)

工作日记2-17起(Work diary 2-17 onwards) February 17th morning eight fifty arrived at the site, nine oclock reported tube, 8, 9, 10 meters, a car, 13, 14 meters a car Check the dormitory pile position in the morning, 2# machine missing parts not repaired, 1# machine did not lift hammer At noon, after lunch, 1# machine worker hammer, 2# machine parts to. According to the afternoon workshop park has been put out two coordinates to the plant outside the road, the release of four axes (3, A, 1, F, 1, K, 1, T), and dormitory building with a coordinate system, turn out two points. Stolen electric cars in the evening, lost in the afternoon has turned two coordinate records. On the morning of February 18th, we went to the South Ring Road drilling machine site and released three piles Arrive at the construction site at eleven a.m., unload the pipe pile at half past twelve, start construction with 1#, and give 2# in the afternoon The pile location of the workshop is set out, and 52 lofting are completed. Double the two points. February 19th morning, to the Haitian side handed over the coordinates of the construction, and found last years axis intersection point, as well as self built coordinates The points are destroyed. In the afternoon, calculate the pile position of J axis to U axis of the construction plant. In the morning of February 20th, I went to the east of the city to get the center pole. Then I went to the Survey Bureau to take the original coordinates of the sky and sea. I went there in the morning Haitian turn out the axis of the R D building, in the afternoon will be handed over to the construction team and coordinates. In February 21st the site shut down Cizao pile, dormitory layout 4 piles, workshop on activities of the housing side lofting 70 piles (K axis, --T axis). Two barrels of diesel oil in the afternoon. The morning of February 22nd to Yi Quan Jie gas station next to buying a bundle of steel wire rope to Cizao pile Two machines in the morning are started, a

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档