地下防水工程(Underground waterproofing works).doc

地下防水工程(Underground waterproofing works).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下防水工程(Underground waterproofing works)

地下防水工程(Underground waterproofing works) I. the underground impervious concrete structure is self waterproof. 1, underground waterproof concrete impermeability grade is 0.6Mpa, basement floor of large volume of impervious concrete, construction requirements continuous uninterrupted, can not leave construction joints, a continuous casting successfully. In order to ensure the construction quality and waterproof performance of waterproof concrete and prevent cracks, the following main technical measures should be taken during construction. 2. Design of mix proportion of impervious concrete Concrete mix design and experiment work of commercial concrete manufacturers ahead of time. And thermal calculation should be done by a professional thermal engineer to optimize the optimum concrete mix ratio and minimize the cement content. At the same time, some concrete measures to prevent concrete cracks are put forward. In order to reduce the hydration heat of cement, the cement without R is selected as far as possible. The amount of cement per cubic concrete should be controlled at 300 kg or less, as far as possible to reduce the hydration heat, humidity prevention of cracks. 3, using three mixing technology to prevent cracks Adding lime and fly ash to replace part of cement, to reduce the heat of cement, delay the heat release rate of cement, and improve the strength of concrete at the later stage. The new technology of HEA compensating shrinkage concrete is adopted to increase the compactness and impermeability of concrete. Thirdly, slow condensate pump is used to reduce water consumption, delay hydration time and improve workability and workability of concrete. 4 、 structure improvement technology: According to the construction experience, at the basement exterior wall corner, because the temperature and shrinkage effect is especially easy to produce stress concentration to the crack in the wall, is the best measure to prevent such cracks is at the corner increase anti crack

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档