工程从进场到竣工 资料报验的一般程序(From the approach to the general procedure of project completion data inspection).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程从进场到竣工 资料报验的一般程序(From the approach to the general procedure of project completion data inspection)
工程从进场到竣工 资料报验的一般程序(From the approach to the general procedure of project completion data inspection)
From the approach to project completion data inspection the general procedure of.Txt cable as many people earned the youth live sometimes touching is not worth mentioning things. Are broken is not the most cruel and most cruel is stepping on these fragments but pretended not to find the stubborn pain if I meet again how perfect people are the future, there is a disadvantage, he is not you, _____ next life to be male, marry a girl like me. From the approach to the general procedure of project completion data inspection
1, construction organization design (program) reported trial
2, drawing record
3, technical (safety) disclosure
4. Commencement report
5, management list
6, all kinds of material inspection
7, design changes
8, on-site visa
9, hidden inspection
The 10 batch of inspection and inspection
11, project inspection
12, the division of engineering inspection
13, engineering inspection unit
14. Completion report
6-8 of them are involved in the construction of the whole project
Data arrangement and reporting order:
(I) beginning of approach
Construction technical document examination form, attached construction organization design
The qualification of sub contractors shall be submitted to the examination form and attached to the enterprise qualification
List of project management personnel, copy of qualification certificate
Enter the procedure with Party A and sign the safety agreement
Internal data
Organize list of construction team
Copy of ID card and copy of special job certificate
Provide on-site and written safety and technical disclosure to the construction team and file them
technical information
File the design approved drawings as the basis for construction.
Keep track of changes in drawings at any time
Contract of construction and contract of construction team, bid documents, bid winning notice.
Sign the agreement with the construction team as required
您可能关注的文档
- 地宝---好产品更需好话术管理(Treasure - good product needs good operation management).doc
- 地方税体系现存问题剖析与改革方向探索(Analysis of existing problems of local tax system and exploration of reform direction).doc
- 地方税务局2012年纳税评估优秀案例及模型评选办法(Local Taxation Bureau 2012 tax assessment excellent case and model selection method).doc
- 国际项目管理的发展特点及我们的对策(The development features of international project management and our countermeasures).doc
- 地板砖(Floor tile).doc
- 地方高职院校师资队伍建设实践管理(Local higher vocational colleges, teaching staff, construction, practice, management).doc
- 地沟油检测法(Hogwash oil test).doc
- 地漏(The floor drain).doc
- 地理疑问(Geographical questions).doc
- 地理学家郦道元(Geographer Li Daoyuan).doc
- 工程直做秘笈)(Engineering straight tips)).doc
- 工程量单位(Unit of quantity).doc
- 工资为何悄悄被扣 曝工资被扣的十大方式(Why wages are quietly deducted exposure wages detained ten ways).doc
- 工作总结——青年干部培养(Summary of work -- training young cadres).doc
- 巨力集团扬子的管理经验(Juli group management experience of the Yangtze).doc
- 差异化应该注意什么(Differentiation should pay attention to what).doc
- 差异化营销--从战术到战略(Differentiated marketing from tactics to strategy).doc
- 工资待遇(Salary treatment).doc
- 布署还是部署(Deployment or deployment).doc
- 帆布包的来源打造的品牌理念(The origin of the canvas bag is the brand concept).doc
文档评论(0)