- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建造师看看就过2(The first engineer sees over 2)
一级建造师看看就过2(The first engineer sees over 2)
1, project scope: (1) design procurement and construction general contracting EPC: work content: the contractor for all design, equipment and materials procurement, construction and installation construction, commissioning until operation; (2) the design and procurement of equipment of EP general contracting work: the contractor undertake engineering design, equipment procurement and site installation and technical guidance, and undertake the design and put into trial operation after the liability of construction quality; (3) general contractor C content: the contractor of construction and installation construction, some projects include material purchasing, contractor commitment content and the risk of project scope, also deal with the commissioning operation due to construction quality problems responsible; (4) EPC installation: installation contractor bear only part content of engineering construction, and is responsible for the quality of the installation of feeding after operation. (5) mechanical and electrical engineering contractor such as mechanical equipment installation engineering general contracting, electrical automation instrumentation engineering contracting, water supply and drainage engineering contracting, anti-corrosion insulation engineering contracting, engineering contracting, heating and ventilation engineering contracting furnace masonry.
2, invalid confirm: 1. failed to respond to the tender documents tender in essence; 2. tender documents clearly does not meet the requirements of the important defect; 3., resort to deceit collusive pricing below cost price 4. bid; bid; bid evaluation experts and 5. do not fit or improper behavior; 6. is not required by the tender deposit the tender.
3. Mechanical and electrical engineering bidding procedures: study bidding documents ---- detailed investigation and Research - review the amount of work - prepare tender documents - submit tender documents.
4, technica
您可能关注的文档
- 永远要跟比你更成功人在一起.doc
- 求职方法及应聘技巧.doc
- 汇集全球26位医生的经验及智慧的专业建议.doc
- 汇率本质.doc
- 汉中——汉文化发详地.doc
- 汉字中常见错字.doc
- 永嘉学派义利观与当代价值.doc
- 汉语文本聚类与算法设计.doc
- 求真务实是企业文化灵魂.doc
- 汉隶名碑教学:《曹全碑》简介与临习技法.doc
- 七年级地理下册第八章第六节巴西教案.pdf
- 初中语文:发酵食品微生物文学形象塑造与审美价值研究教学研究课题报告.docx
- 高中数学教育中基于用户兴趣的智能学习资源推荐系统构建教学研究课题报告.docx
- 基于AI的小学语文与科学教育的跨学科教学策略研究教学研究课题报告.docx
- 《既有建筑绿色改造与城市建筑绿色建筑评价体系的经济效益评估》教学研究课题报告.docx
- 高中数学课堂中的合作学习与探究式教学研究教学研究课题报告.docx
- 《基于大数据的环境应急管理决策支持系统在能源安全事件中的应用》教学研究课题报告.docx
- 初中历史教学多媒体素材色彩情感设计:人工智能教育资源开发与历史素养教育研究教学研究课题报告.docx
- 小学体育教育公平评价权重动态调整策略与大数据分析研究教学研究课题报告.docx
- 七年级数学下册《角》练习题及答案(青岛版).pdf
文档评论(0)