analysis of the power project cost management and cost control(分析项目的成本管理和成本控制)
Analysis of the power project cost management and cost control
Abstract: With the ‘two network’ transformation in depth, further open up the electricity market, power supply requires a substantial increase in power grid construction and transformation to accelerate the pace of the characteristics of combined electrical engineering and work practice their own proposed reasonable control of the project cost a few suggestions to improve investment efficiency, improving infrastructure project management.
Keywords: power engineering, cost, control In recent years, the rapid rise in cost of power engineering, financing is very difficult, the project cost has an impact on the power level of the healthy development of the key, therefore, control the project cost issue is particularly prominent. To meet the market economy, need to establish a set of scientific and reasonable project cost management system, and electrical engineering projects of the project planning, financing, design, implementation, production management, loan repayment and asset increasing the value of the whole process is responsible for strengthening project management and control of all stages, in order to effectively control and reduce project cost.
A preliminary project cost control project of the main factors Current due to power surge in demand, in order to meet the growing demand for electricity, and to speed up construction of power, resulting in many engineering project proposal only, without review of preliminary design and budget approval in the case had been under construction, while construction edge design, while preparation of Construction Budget, due to project constraints, construction period, resulting in not enough depth feasibility study, cost control for subsequent troubles buried addition, power construction project feasibility study by the construction unit most of the planning department or commission a professional institute to complete, and the completion of
您可能关注的文档
- analysis of the legal system and education is an effective way to manage the school vocational colleges(分析法律制度和教育是一种有效的方法来管理学校的高职院校).doc
- analysis of the legal system of china's overseas investment insurance construction(分析中国海外投资保险法律制度的建设).doc
- analysis of the library in building a harmonious society and the role of culture(分析了图书馆在构建和谐社会和文化的作用).doc
- analysis of the life and philosophy of the boat(船上的生活和哲学分析).doc
- analysis of the lightning protection grounding cable system(防雷接地电缆系统的分析).doc
- analysis of the linguistic point of view from the social network of language vitality(从社会语言学的角度分析网络语言的生命力).doc
- analysis of the listed companies is the compulsory acquisition system(分析上市公司的强制性采集系统).doc
- analysis of the legal issues of the regulatory system of china's real estate sale(法律问题的分析中国的房地产销售的监管体系).doc
- analysis of the listed power generation companies pay executives analysis of factors affecting(分析上市发电公司支付高管薪酬的影响因素分析).doc
- analysis of the life of higher education teaching and learning process to generate concept(分析高等教育教学和生活的学习过程产生的概念).doc
文档评论(0)