- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of water conservancy construction quality(分析水利施工质量)
Analysis of water conservancy construction quality
Write papers network: [Paper Keywords] proposed water project quality management issues [Abstract] quality of the project is a national economic and technological level of expression, is a major national scientific and cultural qualities of the sign. Large water infrastructure investment, public welfare and strong, the economic and social development has an important role to ensure that construction quality of infrastructure capabilities to play, will the sustainable development of the national economy and social well-laid the material foundation. In this paper, water conservancy project quality management problems in-depth analysis, and on this basis suggested.
Hydraulic Engineering is a national infrastructure projects, embankment, dam building quality, related to people’s lives and property, engineering, quality will directly affect the country’s reputation and national image in recent years, widespread use of water conservancy project construction project legal person (construction unit responsible for supervision of the control unit, construction unit to ensure the quality of supervision and the government combined the quality management system. this system in the proper use of state investment to ensure the quality of water conservancy construction has played an important role.
An impact on the quality of water conservancy construction of the main factors First, the ‘staff’, including participation on the basis of the construction of the organizers, commanders and operators. Each staff member directly or indirectly affect the quality of the project. Improve the quality of the project lies in improving the quality of people, including people’s political ideological level, physical fitness, etc. of high quality and their high-quality work will bring high-quality products.
The second is ‘material’, material from the following aspects of management control: strict material purchase o
您可能关注的文档
- analysis of the united states on the form of vocational education and vocational education programs(分析美国职业教育和职业教育的形式).doc
- analysis of the university art and design education to explore new ideas(大学艺术与设计教育的分析来探索新的想法).doc
- analysis of the university art education and innovative thinking culture(分析大学艺术教育和创新思维文化).doc
- analysis of the university faculty building- issues and thoughts(分析大学教师建设的问题和想法).doc
- analysis of the university library and the college of education and cultural functions of play improving the quality of(分析高校图书馆和学院的教育和文化功能的发挥改善的质量).doc
- analysis of the university of compulsory mental health education as a psychology based on net _ _ behalf of the thesis(分析强制心理健康教育作为大学的心理学基于代表论文网_ _).doc
- analysis of the university language marginalized the plight of teaching to reflect(分析大学语言教学,以反映边缘化的困境).doc
- analysis of the university of culture- new university of content-based training(分析大学的文化u2014u2014新大学基于内容的培训).doc
- analysis of the university of physical education problems and solutions(分析大学的体育教育问题和解决方案).doc
- analysis of the university library and campus culture(分析高校图书馆与校园文化).doc
文档评论(0)