2014秋北航建筑设备 在线作业一(The fall of 2014 northern construction equipment operation online).docVIP

2014秋北航建筑设备 在线作业一(The fall of 2014 northern construction equipment operation online).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2014秋北航建筑设备 在线作业一(The fall of 2014 northern construction equipment operation online)

2014秋北航建筑设备 在线作业一(The fall of 2014 northern construction equipment operation online) Northern building equipment operation online Total score: 100 test time: - A multiple-choice question A, (a total of 25 multiple-choice questions, a total of 100 points.) V 1. the following is part of the indoor drainage system (ABCD). A. sanitary ware B. drainage pipe system C. ventilation pipe system D. cleaning equipment Score: 4 points Including 2. envelope heat transfer mode (ABC) A. heat conduction B. convection C. radiation D. receiver Score: 4 points Including the 3. factors affecting the economic thermal resistance (ABCD) A. national economic policy B. architectural design C. heating design D. weather conditions Score: 4 points The concentration degree of the 4. air conditioning system by air handling equipment can be divided into (ABC) A. central air conditioning system B. semi central air conditioning system C. decentralized air conditioning system D. integral type air conditioning system Score: 4 points 5. according to the heating medium heating system can be divided into: (ABCD). A. hot water heating B. steam heating C. radiation heating D. hot air heating Score: 4 points 6. to eliminate the noise structure transfer understanding is correct (ABC) The main method is to eliminate A. and based on rigid connection B. install the damping member between the source and the foundation C. fan, water pump, compressor import and export should be equipped with flexible joints D. installation component can completely eliminate the vibration sources to the foundation Score: 4 points According to the 7. types of heat medium heating boiler, boiler types can be divided into (AB). A. hot water boiler B. steam boiler C. oil fired boiler D. gas boiler Score: 4 points 8. according to the principle of noise elimination, muffler can be divided into (ABCD) A. muffler B. resonance muffler C. muffler D. broadband composite muffler Score: 4 points The cold air into the interior of the 9. heating

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档