214成套配电柜、动力开关柜(盘)安装施工工艺(214, complete sets of power distribution cabinets, power switch cabinet (plate) installation process).docVIP

214成套配电柜、动力开关柜(盘)安装施工工艺(214, complete sets of power distribution cabinets, power switch cabinet (plate) installation process).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
214成套配电柜、动力开关柜(盘)安装施工工艺(214, complete sets of power distribution cabinets, power switch cabinet (plate) installation process)

214成套配电柜、动力开关柜(盘)安装施工工艺(214, complete sets of power distribution cabinets, power switch cabinet (plate) installation process) The range of 1 This technology is applicable to 10kV and the following general industrial and civil electrical installation engineering of complete sets of power distribution cabinet, power switch cabinet (disk) installation and the two loop line. 2 construction preparation 2.1 requirements of equipment and materials: 2.1.1 equipment and materials are in line with national or issued by the Ministry of the current technical standard, meet the design requirements, and factory certification. Nameplate, and indicate the name of the manufacturer, complete accessories and spare parts. 2.1.2 the installation and use of materials: 2.1.2.1 type steel should be no obvious corrosion proof materials, and, two node certificate wire should take the the Great Wall sign. 2.1.2.2 galvanized screws, nuts, washers, spring pad, anchor bolt. 2.1.2.3 other materials: galvanized wire, phenolic plate, color paint, antirust paint, paint, plastic hose, plastic pipe, nylon tape, special white line, insulation pad, signs, welding rod, blade, oxygen and acetylene gas shall comply with the quality requirements. 2.2 main equipments: 2.2.1 lifting and transporting equipment: truck, crane, trolley, hoist, chain, wire rope, rope rigging etc.. 2.2.2 installation tools: bench drill, electric hammer, electric drill, grinding wheel, electric welding machine, welding tools, table vice, file, move hand, hacksaw, head, cutting pliers, a screwdriver, electric knife etc.. 2.2.3 testing tools: level, megohmmeters, multimeter, level, test pencil, pressure test instrument, steel ruler, steel tape, vacuum cleaners, feeler, wire, etc.. 2.2.4 send security appliance operation: high voltage electroscope, high voltage insulation boots, insulated gloves, woven ground powder fire extinguisher. 2.3 operating conditions: 2.3.1 construction conditions: 2.3.1.1 civil engineering construction level,

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档