- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ipmp c级试题c-18慧源软件答案(IPMP c test C-18 source software.)
ipmp c级试题c-18慧源软件答案(IPMP c test C-18 source software.)
This paper contributed by tan_wxl.
Pdf document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
Test C (Computer software).
Item 1: (20 points)
1.1 (9) of Table 1 cash flow unit: million annual sales revenue of investment cost and net cash flow cumulative net cash flow discount coefficient (discount rate 12%) value of -480 -480 0.8929 -428.592 -428.592 total value of 200748015037.25 112.75 -367.25 0.7972 89.884 -338.708 25068.75 181.25 -186 0.7118 129.014 -209.694 35080.25 269.75 83.75 0.6355 171.426 35080.25 269.75 0.5674 153.056 -353.50 -38.268 114.78820082009201 2011
1.2 (3) of static investment payback period since the year since the investment in the project for the T= (4-1) +|-186|/269.75=3.69 1.3 (4) dynamic payback period of the project is T= (5-1) +|-38.27|/153.056=4.25 years of the project investment income rate of E=1/T=1/4.25=23.529%, the dynamic standard dynamic investment rate of return is 18%, so the project is feasible in the economy. 1.4 (4) internal rate of return of economic significance: the internal rate of return refers to the project in the whole period net cash flow value of each year and the discount rate is equal to zero.
NPV = sigma (Bt? Ct)
T =0
N
1 =0 (1 + I0) t
Note: I0 = IRR
When the discount rate is I0, if IRR is larger than I0, the investment project can be accepted; if IRR is less than I0, the project is not economical. The comparison of two equal investment scheme, IRR scheme was smaller than that of IRR scheme is preferable. The general calculation method can find the approximate solution of the internal rate of return by linear interpolation formula, the formula is: IRR = I1
NPV1 (I 2i1) NPV1 + NPV2
Type I1: the low discount rate, the discount rate is high I2, NPV1 and I1 corresponding to the net present value, NPV2 and I 2 corresponding negative NPV (i2- I1), which is generally not more than 2% - 5
您可能关注的文档
- f2812把程序从flash搬到ram中运行(F2812 runs the program from flash to ram).doc
- ff13-2泰迪熊问答中文版(Ff13-2 teddy bear ask Chinese version).doc
- fft-1.1(fft - 1.1).doc
- fft(快速傅立叶变换)(FFT (fast Fu Liye transform)).doc
- fft变换,获得采样数据基本信息(The FFT transform obtains the basic information of sampled data).doc
- fifaol3攻防攻略与技巧(Fifaol3 offensive and defensive tactics and skills).doc
- fileupload插件使用(FileUpload plug-in usage).doc
- final cut pro剪辑电影流程简介(Final Cut Pro剪辑电影流程简介).doc
- flex现状(Flex status).doc
- flac模拟隧道开挖支护的实例(An example of FLAC simulated tunnel excavation support).doc
- 2026版创新设计高考总复习地理中图版教师用-第58课时 交通运输与区域社会经济发展.docx
- 2026版创新设计高考总复习地理中图版教师用-第71课时 南水北调对区域发展的影响.docx
- 2026版创新设计高考总复习地理中图版教师用-第81课时 环境保护与国家安全.docx
- 2026版创新设计高考总复习地理中图版教师用-第77课时 海洋空间资源与国家安全.docx
- 2026版创新设计高考总复习地理中图版教师用-第72课时 黄河流域内部协作.docx
- 教育硕士考前冲刺练习含答案详解【达标题】.docx
- 教育硕士经典例题附答案详解【考试直接用】.docx
- 教育硕士综合提升测试卷附参考答案详解(完整版).docx
- 教育硕士题库附参考答案详解【黄金题型】.docx
- 教育硕士预测复习最新附答案详解.docx
最近下载
- 《质量评估流程》课件.ppt VIP
- 17J008 挡土墙(重力式、衡重式、悬臂式)(最新).pdf VIP
- 2024年数智工程师职业鉴定考试复习题库(含答案).docx VIP
- (完整版)建筑施工技术交底范本(大全) .pdf VIP
- 水运工程大体积混凝土温度裂缝控制技术规范_JTS-T 202-1-2022.pdf
- 设备供货、安装、调试、验收方案.docx VIP
- 《水利水电工程施工图审查技术导则》.pdf VIP
- 《木材学》——李坚 木材学笔记(完整).doc VIP
- 《公路水泥混凝土路面施工技术规范》_(JTGF30-2015).pdf VIP
- 小学生数学学习自查习惯现状调查报告.pdf VIP
文档评论(0)