- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
spa和健身中心设计(Spa and fitness center design)
spa和健身中心设计(Spa and fitness center design)
SPA and fitness center design #1
JR chief designer: Raymond
Operation introduction
SPA and fitness center area and diversity is different from the hotel, they have their own unique design, may include:
* entrance / reception area
* the locker room
* SPA
* the swimming area
* movement area
* physiotherapy room
* drink.
This project involves the specified minimum standards in H. I. T. Preliminary regional planning issued by S in accordance with the following 4 categories to determine:
* SPA holiday
* the city of SPA
* Club
* fitness center
SPA and fitness center may only run for the hotel guests to use, can also be a member of the foreign service.
Planning area of all the SPA and fitness center will provide the basic channel and connected to the locker room of the route, this route can not enter the operating area, and avoid the cross regional dry region. As the buildings structure, excessive regional conflict must be combined.
Space design requirements
SPA and fitness center to located by stairs and elevator room, and directly to the guest room area. From the overall need to direct the street entrance increase channels from the public areas of the hotel and prepare for members and external guests.
For disabled customers and members to provide at least through the entrance and circulation channel device. The equipment must comply with local regulations or with minimum major disability policy ADA/ international recognition.
In all areas, must be used in English provides overall direction and location including equipment instructions and safety standards, planning.
Cannot use fluorescent lamp or PL type lamp.
Entrance / reception area
* provided with intelligent entrance door lock for hotel guests, after the design of Business Hours channel. Channel control all internal area entrance door. All the way to the Russian region from inside the exit doors should be locked, and equipped with automatic closing device. According to the d
您可能关注的文档
- plane(飞机).doc
- pla最具大规模产业化优势(PLA the most large-scale industrialization advantages).doc
- plc与编码器的应用(The application of PLC and encoder).doc
- plc在棉纺细纱机电气控制系统的应用(Application of PLC in electric control system of cotton spinning frame).doc
- plc干扰(PLC interference).doc
- pom材料特性(pom材料特性).doc
- powerpc 常用寄存器简介(Introduction to PowerPC common registers).doc
- powerpoint 2003题库版5第五章插入及编辑表格和图表b(PowerPoint 2003 question library version 5, fifth chapters insert and edit tables and charts B).doc
- policy route(策略路由).doc
- powerpoint实用技巧荟萃(PowerPoint practical skills).doc
最近下载
- 清水混凝土模板施工工艺.pdf VIP
- 清水混凝土施工工艺质量控制与防治演示文稿.ppt VIP
- GB50164-2021混凝土质量控制标准.docx VIP
- 文旅项目景区景点城市农文旅融合项目稻田主题策划规划方案【旅游】【文旅】【农旅】【文旅规划】.pptx VIP
- 混凝土结构工程施工质量验收规范(英文版).pptx
- 心血管科中医护理课件.pptx VIP
- 混凝土结构工程施工质量验收规范培训课件.pptx VIP
- 《混凝土结构工程施工质量验收规范》局部修订的条文及.docx VIP
- 2012混凝土结构工程施工质量验收规局部修订.doc VIP
- 《混凝土质量控制标准》XX50164-2011正文精华版.doc VIP
文档评论(0)