- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中心机房及配电系统设计(Central computer room and distribution system design)
中心机房及配电系统设计(Central computer room and distribution system design)
Central computer room and distribution system design
Catalog
Central computer room and distribution system design 1
1 、 computer room decoration design 1
1.1 project overview 1
1.2 design basis and technical index 1
1.3 structural decoration 2
1.3.1 movable floor 2
1.3.2 ceiling 3
1.3.3 partition 4
1.3.4 wall and cylinder 4
1.4 distribution system 4
1.4.1 design basis: 4
1.4.2 distribution system 5
1.4.3 lighting system 5
1.4.4 electrostatic leakage system 6
1.4.5 grounding grid 6
1.4.6 distribution system capacity 6
1.4.7 fire fighting and automatic alarm system 7
1.4.8 lightning protection system 7
1.5 air conditioning fresh air 7
2 、 equipment lightning protection grounding protection system (EP) 9
2.1 overview 9
2.1.1 design specification 9
2.1.2 lightning protection and grounding system engineering design content 10
2.1.3 ground resistance requirements 10
2.2 earthing system 11
2.3 lightning protection system 15
2.3.1 roof anti direct measures 15
2.3.2 power supply system 15
Lightning protection and equipment configuration of 2.3.3 signal system 16
2.3.4 use lightning arrester 17
2.4 design of weak current lightning protection grounding system 18
Lightning protection of power supply line of 2.4.2 weak current equipment 18
Lightning protection of signal line of 2.4.3 weak current equipment 18
DC grounding of 2.4.4 weak current equipment 18
2.5 requirements for basic grounding grids 19
3, UPS centralized power supply system. 21
Central computer room and distribution system design
1 、 computer room decoration design
Explanation: the design of this computer room is only preliminary design, and it can not be studied and discussed with the construction unit. According to our companys long-term experience in the design and construction of the computer room, and the introduction of similar specifications of the computer room and launched. The selection of the engine room is medium and high grade, and the
您可能关注的文档
- 中国文学文化知识集结(Knowledge accumulation of Chinese literature and culture).doc
- 中国文学常识(Common sense of Chinese Literature).doc
- 中国文学标准朗读(Standard reading of Chinese Literature).doc
- 中国新型航母一鸣惊人时间(The new aircraft carrier China blockbuster time).doc
- 中国新型系列高原工程装备世界首屈一指(China's new series of plateau engineering equipment is second to none in the world).doc
- 中国新年(春节)风俗与典故(Chinese New Year (Spring Festival) customs and allusions).doc
- 中国新形势(New situation in China).doc
- 中国新贵阶层的现实(九龙山)(Reality of China's upstart class (Jiulong Mountain)).doc
- 中国新闻事业史(China Journalism History).doc
- 中国新闻传播史笔记1(Notes on the history of Chinese journalism and communication 1).doc
文档评论(0)