on the design stage of construction means lower project cost(项目设计阶段的建筑意味着更低的成本).docVIP

on the design stage of construction means lower project cost(项目设计阶段的建筑意味着更低的成本).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
on the design stage of construction means lower project cost(项目设计阶段的建筑意味着更低的成本)

On the design stage of construction means lower project cost [Abstract] Based on China’s current construction cost composition analysis, accounting for the largest proportion of the construction and installation costs, while the construction and installation costs vary depending on the design phase, depending on the design of the application of science and technology content and a reasonable scheme comparison . [Keywords] architecture, design, story, steel, selection General civil buildings from the foundation, walls, columns, beams, panels, stairs, roof, doors, windows and other basic component composition. If in the design of each component is designed, in a number of possible scenarios for economic comparison, the cost of each component down, the entire project cost will come down. Based on China’s current construction cost composition analysis, although the design fee costs in the whole process of construction in the proportion of small, generally only the cost of Kin 1.5% -2%, but the project cost up to 75%, thus shows poor design quality of a good number of direct impact construction costs and construction duration length, directly determine the human, material and financial input the number. rational scientific design, can reduce 10% of project cost, but a lot of design in engineering design personnel heavy, light economy, any increase safety factor or design standards, while the economic considerations and less rational, fundamentally affect the project cost control, especially the design phase of the project the economic impact of up to 70% -95% below the design of civil ways to reduce the project cost a few comments: A choice of ground treatment programs Currently, the building gradually toward multi-layer, high-level, even high-rise. The foundation of the increasingly high demand, the natural foundation has been unable to meet the engineering needs, more and more ground treatment program. There is good variety in terms of the pile

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档