二级建造师实物90个重点(Two constructors, 90 objects).docVIP

二级建造师实物90个重点(Two constructors, 90 objects).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二级建造师实物90个重点(Two constructors, 90 objects)

二级建造师实物90个重点(Two constructors, 90 objects) 1, the moment of inertia of the unit are: M4 2, concrete structure environment category: Five 3, the staircase width B and height H: 2H+B=600-620mm 4, the human ear is most sensitive to 1000Hz voice audio. 5, steel plate size representation of thick long, more than 4M2 steel plate 6, stainless steel is iron chromium content in more than 12% alloy steel. 7, lime: CaCO3 8, Portland cement: P.O 9, cement strength grade with cement mortar specimens in 3 days and 28 days to assess. 10, the best heat resistance of slag cement, Portland cement is suitable for early requirements of high strength concrete. 11, the non active aggregate, it can avoid suffering and destruction of concrete alkali aggregate reaction. 12, mortar preferred in the sand, hollow rate of less than 25% is called solid masonry. 13, marble belongs to alkaline rocks. 14, the conifer wood floor dry density of not less than 0.32g/cm2. Hardwood is not less than 0.50g/cm2. 15, in the general engineering level measurement using DS3 type level. 16, ordinary theodolite DJ6. 17 artificial excavation reserved for the 15-30 layer of the soil without digging. 18, in the excavation of underground water level, water level should be reduced to the pit below 500mm. 19, after the excavation should be carried out before the measurement positioning, leveling line. 20, construction period, the foundation pit excavation section should be taken. 21, the brick foundation below a layer of ash seam is greater than 20mm application of fine stone concrete leveling. 22, slag cement, volcano ash cement mass concrete curing shall not less than 21 days. 23, large volume concrete pouring scheme: comprehensive layered, layered section, inclined layer. 24, brick, stone based features: good compression, good integrity, low cost. 25, the large volume concrete temperature difference between inside and outside the general control in 25 degrees. 26, the large volume should be covered and zhe after wat

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档