人工开挖桩基础工程安全技术交底(Manual excavation pile foundation engineering safety technical disclosure).docVIP

  • 2
  • 0
  • 约1.35万字
  • 约 13页
  • 2017-09-06 发布于河南
  • 举报

人工开挖桩基础工程安全技术交底(Manual excavation pile foundation engineering safety technical disclosure).doc

人工开挖桩基础工程安全技术交底(Manual excavation pile foundation engineering safety technical disclosure)

人工开挖桩基础工程安全技术交底(Manual excavation pile foundation engineering safety technical disclosure) Safety technical clarificaiton construction unit two bureau of China Railway Group Co. Ltd. Guiyang flower orchard R project manager project name of the unit area of Guiyang city flower garden R1 (R2) project 2012 date date The name of the project of manual hole digging pile project production team name of ordinary operators Safety technical disclosure in a pile, the operating conditions of artificial digging work content exergy 1, manual excavation pile hole of the supporting shaft should be according to the soil characteristics, the area of the underground water distribution. The construction scheme of the preparation conditions feasible for the calculation and design of the supporting shaft. 2, before the excavation of the site shall be completed three level. On the ground, underground cables, pipelines and old buildings, The basic equipment and other obstacles have been excluded from processed. The temporary facilities such as lighting, ventilation, power source, Safety facilities ready. The design of section size 3, digging the plane size in order to facilitate the construction of the pile is appropriate but not less than the. The adverse geological zone prohibited illegal operation the design units digging pile drilling is difficult to College Xiang Anquan design and design change according to the provisions of the implementation after approval. The 4 area, the underground water level is relatively high to take measures to reduce the underground water level. When the hole pile construction Now when the water gushing large real-time adjustment of construction program. 5, artificial digging operation is critical to the security of the excavation prior to construction personnel comprehensive security The technical disclosure before the operation of the inspection and test of the sling was safe and reliable to ensure construction safety. 6, prohibit women and minors under th

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档