- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路大纲(Highway outline)
公路大纲(Highway outline)
The third chapter highway
A test engineer exam outline
A test purpose and requirement
The two main examination content
Standard for quality inspection and assessment of highway engineering.
The methods of quality inspection and assessment of Highway Engineering
Understand the concept and division method, unit division and engineering; key projects, regulations such as extreme concept.
Familiar with: Inspection and evaluation procedures; engineering quality inspection; grading method of engineering quality; engineering quality rating.
Master: evaluation standard highway engineering quality inspection of the purpose and scope of the provisions; sub project score.
The roadbed earthwork project quality inspection
Understand: Earthwork subgrade, rock embankment, soft soil foundation, geosynthetics layer basic requirements; appearance identification, Rock Subgrade Earthwork subgrade; experimental project soft foundation treatment, geosynthetics layer; pipe foundation and pipe prefabrication, pipeline installation, inspection section (Yu Shui) basic requirements wellmasonry gully, masonry drains, blind ditch and appearance identification; retaining walls and masonry works the basic requirements and basic requirements of appearance identification; other sub project.
Familiar with: general provisions; earthwork subgrade and roadbed project measured; measured key project of soft soil foundation treatment, geosynthetics layer; general drainage engineering; pipe prefabrication, pipe foundation and pipe installation and inspection (rain) project measured wellmasonry soil ditch, masonry drains, blind the basic requirements for wall ditch; backfill; retaining wall and masonry engineering measurement project; key project measured other projects.
Master: Earthwork subgrade, roadbed measured key project; pipe prefabrication, pipe foundation and pipe installation, check (rain) measured key project wellmasonry soil ditch, masonry drains, blind ditch; retaining wal
您可能关注的文档
- 光盘自动播放(CD auto play).doc
- 光盘尺寸(CD size).doc
- 光盘有限公司(CD Corporation).doc
- 光盘变形或划伤的处理(Treatment of optical disk deformation or scratch).doc
- 光盘说明(CD-ROM instructions).doc
- 光纤基本知识(Basic knowledge of fiber optics).doc
- 光纤接口介绍(Introduction of optical fiber interface).doc
- 光纤接入网技术综述(Overview of optical access network technology).doc
- 光纤接口大全(Optical fiber interface Daquan).doc
- 光纤旋转连接器简介(Introduction of fiber optic rotary connector).doc
- 公路中曲线超高(Ultra high curve in highway).doc
- 公路工程公司表态发言材料(Highway engineering company statement material).doc
- 公路试验仪器大全(Encyclopedia of Highway Test Instruments).doc
- 公路预防性养护管理的加强初探(Strengthening of Highway Preventive Maintenance Management).doc
- 公司财务分析(Corporate financial analysis).doc
- 公路挡土墙设计浅析(Design of highway retaining wall).doc
- 公益创业 大学生创业新路径(Public entrepreneurship, college students, new path of entrepreneurship).doc
- 公需科目考试题库维权试卷(Public needs subjects examination questions library rights exam).doc
- 公路路基基本知识(Basic knowledge of Highway Subgrade).doc
- 六一儿童节(International Children's Day).doc
文档评论(0)