- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊顶工程质量通病及防治措施(Quality defects and prevention measures of ceiling Engineering)
吊顶工程质量通病及防治措施(Quality defects and prevention measures of ceiling Engineering)
Quality problems and preventive measures of ceiling Engineering
A ceiling keel. After installation, the main keel, keel in vertical and horizontal direction is not straight, there is distortion, skew phenomenon. The position of the uneven keel, the camber is not uniform, not smooth, even a wavy line. After the completion of the ceiling, after a short period of use of bump deformation.
The 1. reason analysis?:
? 1. The main keel, keel twist, although after dressing, still not straight.
? 2. Keel hanging position is not correct, hanging point spacing is too large, uneven pull tension.
? 3. No pull line comprehensive adjustment of the main keel, keel height.
? 4. The horizontal line error of measuring ceiling of the ultra poor, the middle flat arch line does not meet the specification.
? 5. Keel after installation, the local construction load is too large, resulting in the local bending deformation of the keel.
? 6. The ceiling is not strong, the inhomogeneous deformation, local subsidence.
2. prevention measures:
? 1. All the main keel and keel are twisted should not be used.
? 2. According to the design requirements of the bomb line, determine the keel hanging position, the main keel or end node location of additional lifting point lifting point spacing is greater than 1.2m the distance from the main station of the keel spacing shall not be greater than 300mm and, when more than 300mm, should increase the boom, when the boom length is greater than 5m, should be set up anti support. When the vessel and other equipment, should be adjusted and additional boom.
3. Increase around the wall or cylinder, according to the requirements of the standard high ceiling height pop-up, line clear, correct position, the elastic water column horizontal line.
4. The keel and the suspender is fixed, according to the standard high adjustment keel elevation, must pull line adjustment, large room can according to
您可能关注的文档
- 古典诗歌鉴赏5(Appreciation of classical poetry 5).doc
- 古典诗词鉴赏方法(Classical poetry appreciation method).doc
- 古典诗词教学重视学生人格情感培养(Classical poetry teaching attaches importance to the cultivation of students' personality and emotion).doc
- 古剑全诗词(All poems).doc
- 古典诗词鉴赏精选训练(Classical poetry, appreciation, selective training).doc
- 古剑奇谭(GuJian).doc
- 古典诗词的表现意象(The imagery of classical poetry).doc
- 古建术语(Ancient terminology).doc
- 古墓女尸(Tomb woman).doc
- 古建筑的建筑面积(The floor area of an ancient building).doc
- 吊顶工艺流程(Ceiling process).doc
- 吊顶施工(Ceiling construction).doc
- 名人与美食(Celebrity and gourmet).doc
- 名义gdp增长率(Nominal GDP growth rate).doc
- 名人管理经典语录200条(Celebrity management classic quotations 200).doc
- 名人诚信故事(Celebrity integrity story).doc
- 名人颁奖(Celebrity Awards).doc
- 名企实习一年我学会15件事(Famous enterprises practice for one year, I learned 15 things).doc
- 名侦探柯南449-582(Detective Conan 449-582).doc
- 名侦探柯南每集都有什么可怕的知识(Detective Conan, what terrible knowledge does each episode have).doc
文档评论(0)