后张法预应力混凝土箱梁施工技术(Construction technology of post tensioned prestressed concrete box girder).docVIP

后张法预应力混凝土箱梁施工技术(Construction technology of post tensioned prestressed concrete box girder).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
后张法预应力混凝土箱梁施工技术(Construction technology of post tensioned prestressed concrete box girder)

后张法预应力混凝土箱梁施工技术(Construction technology of post tensioned prestressed concrete box girder) 1. prefabricated venues Prefabricated venues should be taken into account when the box girder installation and transportation distance and order. The number of beam bottom depending on whether the actual duration of turnover. Shitoukoumen bridge is built with mortar bottom four layers of red brick, then 3cm thick brick cushion in terrazzo paved, with grinding machine polishing, edge of the base block 3*3cm angle for formwork. Do the bottom die pedestal, pay attention to keep good invertedcamber (according to the general design or calculation). In the end 2m pedestal length range under the expansion of foundation, to take the beam pull beam focused on the end of the pedestal stress in zhang. In every 1.2m beam base reinforcement hole for a formwork The construction technology and method of 2. box girder The 2.1 box girder construction process of bottom die trimming -- the bottom plate and web reinforcement welding binding -- buried corrugated pipe -- outer template, template installation -- the roof steel banding -- Installation of negative moment bellows -- pouring concrete -- pouring concrete webs and roof -- stripping health -- wear beam -- steel strand tension -- duct grouting -- sealing anchor 2.2 steel processing and binding (1) characteristics of steel box girder is reinforced dense, bending, embedded parts, construction requirements. The size and specifications of steel processing in strict accordance with the drawings and specifications. (2) reinforced installation process: Lashing floor and web reinforcement layout -- positive moment bellows -- the installation side mode, die -- lashing top steel -- layout of negative moment bellows expansion joint, for the drainage hole and guardrail etc. must ensure the pre buried steel exact position, do not miss. 2.3 prestressed anchor plate and prestressed steel set corrugated pipe, corrugated pipe can be designed according to th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档