- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
从中国制造到中国创造(From made in China to created in China)
从中国制造到中国创造(From made in China to created in China)
example
abstract
The desperate attitude, gathered a large number of outstanding talents for the East Electric Group, create the necessary conditions to create a good corporate culture, but also to the truth-seeking, innovation, and strong enterprise spirit deeply rooted in the hearts of everyone, as group cohesion, pioneering and innovative spirit of strong power
The crown of glory is ever woven with thorns. The first few steps of Dongfang Electric were difficult but firm.
Under the three major power plant, Oriental motor, Dongfang Boiler, East gas turbine was founded in five of the last century, in 60s, is a specific historical period of three line enterprises, in a long historical period was limited below 200 thousand KW generating units of production. Dongfang Electric in the road so steps further development of 300 thousand kilowatts of generating units, according to the group general manager Szev recalled, when the country without a penny of investment, there is no import technology from foreign channels.
At that time the old director Ding tears said: 300 thousand, no hard they have! Id rather work as a factory director, and make sure that the 300 thousand KW generator is worked out...... It was with this subsidiary of Dongfang Electric Drive, tighten their belts, rely on manufacturing knives, biogas manure and other products provided to survive, to raise funds, to withstand pressure, difficulties, 11 years of hard work, finally developed the Easts first 300 thousand kilowatts of thermal power units in 1983, Dongfang Electric proudly called zhengqiji.
It is precisely with firm belief and never admit defeat stubborn, Dongfang Electric in the field of thermal power manufacturing firm footing, but also for the future to achieve greater beyond, won the development of space. By 1981, Dongfang Electric to design and manufacture of Gezhouba Dam 170 thousand kilowatts of generating units put into operation, the turbine
您可能关注的文档
- 初中二年级英语课文英汉对照19(English text for grade two in junior middle school English Chinese 19).doc
- 初三语文期中检测试题28089(Test questions in the third stage of Chinese language 28089).doc
- 初中作文(Junior high school composition).doc
- 初中化学基本概念和重要物质(Basic concepts and important substances of junior middle school chemistry).doc
- 初中化学教学论文 为化学课堂注入源头活水(Junior high school chemistry teaching for chemistry class paper into the springhead).doc
- 初中化学燃烧和燃料单元测试题(Junior high school chemistry, combustion and fuel unit tests).doc
- 初中一年级知识(First year knowledge of junior high school).doc
- 初三语文期中检测试题23985(Test questions in the third stage of Chinese language 23985).doc
- 初中历史周年大事年表(Chronology of historical events in junior high school).doc
- 初中历史基础讲解(Junior middle school history basis explanation).doc
- 四川省德阳市罗江中学2025届高三考前热身化学试卷含解析.doc
- 山东省枣庄现代实验学校2025届高三下学期第五次调研考试化学试题含解析.doc
- 吉林省长春市十一高中等九校教育联盟2025届高三一诊考试生物试卷含解析.doc
- 2025届江苏省盐城市伍佑中学高考仿真模拟化学试卷含解析.doc
- 2025届广西贺州中学高考冲刺押题(最后一卷)生物试卷含解析.doc
- 安徽省池州市贵池区2025届高三第一次模拟考试生物试卷含解析.doc
- 宁夏银川一中2025届高三(最后冲刺)化学试卷含解析.doc
- 广东省广州市增城区四校联考2025届高考压轴卷化学试卷含解析.doc
- 2025届邯郸市第一中学高考生物必刷试卷含解析.doc
- 2025届安徽省安庆市石化第一中学高考仿真卷化学试卷含解析.doc
文档评论(0)