二级建造师务实(Two stage construction division pragmatic)
二级建造师务实(Two stage construction division pragmatic)
1. The units of moment of inertia are: M4, ricky253044370, qq7799808
2, concrete structure, environmental categories: five categories
3, the width of the stair step B and height H relationship: 2H+B=600-620mm
4, the most sensitive audio for human ears is 1000Hz.
5, steel plate specifications for the thickness of long, larger than 4M2 plate is thick plate
6, stainless steel is chromium content of more than 12% of iron based alloy steel.
7, quicklime: CaCO3
8 ordinary portland cement: P.O
9. The cement strength grade is evaluated on cement mortar specimens at 3 and 28 days.
10, slag cement heat resistance is the best, Portland cement is suitable for early strength requirements of high concrete works.
11, the use of non activated aggregate, it can avoid concrete subjected to alkali aggregate reaction and damage.
12, mortar preferred sand, hollow ratio of less than 25%, called solid masonry.
13 marble belongs to alkaline metamorphic rock.
14, softwood wood floor dry density of not less than 0.32g/cm2. Broadleaf not less than 0.50g/cm2.
15, in general engineering, leveling uses DS3 type level.
16 ordinary theodolite DJ6.
17, artificial excavation reserved 15-30, a layer of soil does not dig.
18, below the ground water level excavation, water level should be reduced to below 500mm.
19, pit excavation should be completed before: measurement, positioning, copy flat release.
20, construction period, the foundation pit excavation section should be taken.
21, brick foundation below a layer of gray seam is larger than 20mm, apply fine stone concrete leveling.
22, slag cement, volcanic ash cement mass concrete maintenance shall not be less than 21 days.
23, mass concrete pouring program: comprehensive stratification, sub layered, inclined layered.
24, brick and stone foundation features: good compression resistance, good integrity, low cost.
25, large volume concrete internal and external temperature difference is generally cont
您可能关注的文档
- 恩施母婴健康统计.ppt
- 患者安全管理体系.ppt
- 总结出三种流产方法对人体的伤害.ppt
- 总结了50种家庭烹饪实践.ppt
- 性继承回顾.ppt
- 总访问员.ppt
- 慢性疼痛诊所简介.ppt
- 慢性同种异体肾病.ppt
- 意识和注意力.ppt
- 想戒烟方法是关键.pptx
- 2024年自考专业(计算机网络)试题预测试卷重点附答案详解.docx
- 高校实验室安全考试《电气试题预测》新版_4.doc
- 2024年自考专业(计算机网络)试卷含答案详解【夺分金卷】.docx
- 2024年自考专业(计算机网络)试题预测试卷及完整答案详解【考点梳理】.docx
- 2024年自考专业(计算机网络)试题含答案详解【综合题】.docx
- 2024年自考专业(计算机网络)试题预测试卷及完整答案详解【各地真题】.docx
- 2024年自考专业(计算机网络)试卷带答案详解(最新).docx
- 2024年自考专业(计算机网络)试题【A卷】附答案详解.docx
- 2024年自考专业(计算机网络)试卷附答案详解【培优B卷】.docx
- 2024年自考专业(计算机网络)试题【A卷】附答案详解.docx
文档评论(0)