二级建造师建设工程施工模拟试题【附答案】(Two construction engineer construction engineering simulation questions [attached answer]).docVIP

二级建造师建设工程施工模拟试题【附答案】(Two construction engineer construction engineering simulation questions [attached answer]).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二级建造师建设工程施工模拟试题【附答案】(Two construction engineer construction engineering simulation questions [attached answer])

二级建造师建设工程施工模拟试题【附答案】(Two construction engineer construction engineering simulation questions [attached answer]) A single choice (a total of 70 questions, 1 points for each question. Each item options, only 1 of the most to do) 1. project management theory is the most basic method of project objectives (). A. static control D. passive control of active control C. B. dynamic control Quality management system 2. construction enterprise project manager to construction qualification system transition time for (years). A.2 B.3 C.4 D.5 3. during the construction of the project is in the center position of the project construction has overall management responsibility is (). A. project chief engineer project manager B. D. design project engineer C. construction project manager 4. for a project management team, the following statement is not true (). A. can take the project members within the organization to distribute B. through bidding to obtain specific C. personnel must arrange D. within the organization can be obtained through external recruitment of project managers 5. construction project management in the cost to the construction side is (). A. B. C. estimates the investment target cost target target D. budget target 6. engineering supervision units in accordance with the terms of the contract for supervision of supervision to fulfill obligations, shall supervise and inspect the project without inspection or not in accordance with the inspection, thus causing losses to the construction unit, shall bear the corresponding (). A. B. D. legal liability default liability compensation liability C. 7. in the following expenses, belongs to the indirect costs of the building installation engineering (is) A. construction units take temporary facilities fee B. dangerous operation accident insurance for the C. production workers labor protection fees D. finished project and equipment protection E Direct project cost 8. a project only yuan labor costs, materials and machinery cos

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档