- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
重庆涪陵李渡长江大桥(Fuling, Chongqing, Li ferry, Yangtze River Bridge)
重庆涪陵李渡长江大桥(Fuling, Chongqing, Li ferry, Yangtze River Bridge)
Introduction of bridge
Li ferry, Yangtze River Bridge
Chongqing Fuling Lidu Yangtze River Bridge City bridge is designed according to the standard, the line level for the city main road grade, bridge is a cable-stayed bridge with double cable bridge symmetry of Twin Towers, a total investment of 355 million yuan, a total length of 822 meters, the bridge is a concrete cable-stayed bridge with double cable planes of symmetry of Twin Towers, 22.5 meters wide bridge, two-way four lane. Using SMA asphalt concrete pavement, design speed 50km/h. It is located in the upper reaches of the Yangtze River in the main city of Fuling, with a design base period of 100 years. The stay cable is arranged in a fan-shaped arrangement and is made of reinforced anticorrosive material, and is beautiful and practical. It is also the first time that Fuling has adopted the BOT model for urban construction projects
2 construction phase
In April 28, 2003, the first Planning Commission of the Fuling district approved the construction of Li ferry Yangtze River bridge.
In January 30, 2004, the foundation construction ceremony of Li Tong Yangtze River bridge pier foundation was held.
In February 18, 2004, Li crossing Yangtze River bridge formally broke ground.
In December 22, 2004, Lee crossed the Yangtze River bridge franchise contract officially signed.
In April 26, 2006, Li crossed the main tower in Yangtze River bridge.
At 7:50 on July 21, 2007, the main bridge was closed.
In October 28, 2007, Li ferry Yangtze River bridge was officially opened to traffic.
3 construction significance
Chongqing, Fuling, Yangtze River bridge, after the completion of the Li River and south bank Pu, Jiangnan three films into a line, the Li Tong new district into Fuling, one city, four pieces of the development of space.
In the future, the main city of Chongqing by Chongqing Fuling Expressway to the city of Fuling, in Li Du Road, the Lidu Yangtze River b
您可能关注的文档
- 自制船模动力传动齿轮箱(Self made ship model power transmission gear box).doc
- 自信美(Confident beauty).doc
- 自制英语1(Homemade English 1).doc
- 自制英语3(Homemade English 3).doc
- 自制西红柿酱(Homemade tomato sauce).doc
- 自制ghost系统盘(Homemade ghost system disk).doc
- 自制超轻型飞机过程(Homemade ultralight aircraft process).doc
- 自制辅食食谱(Homemade complementary food recipes).doc
- 自制进度条控件(vb)(Homemade progress bar control (VB)).doc
- 自制酸奶常识(Homemade yogurt commonsense).doc
文档评论(0)