预压托换桩加固及顶升纠偏工地进程实践.pdfVIP

预压托换桩加固及顶升纠偏工地进程实践.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预压托换桩加固及顶升纠偏工地进程实践

3 7 18.69.15 mm/d 3 d 0.530.007 7 mm/d5 a TU 472.2 A 1000 6915(2005)15 2795 07 FOUNDATION REINFORCEMENT AND BUILDING RECTIFICATION OF DEVIATION BY JACK-UP AND PRELOADING UNDERPINNING PILE Abstract A 3-story brick concrete structural building was added to 7-story in Xi′an CityShaanxi Provinceand the new-added part is a frame structure. Because two different structural systems are not separated completely and the designer adopted unsuitable ground treatment method the building became leaning seriously when the major structure was completed. The inclination ratio and settlement rate of building are up to 18.6 and 9.15 mm per dayrespectively and the building is bound to collapse. The scheme of rectifying deviation by jack-up and by preloading underpinning pile was employed after investigation for sake of safety. Based on this case the following aspects are investigated the formula to determine the numbers of underpinning piles for rectifying leaning building is presented scheme choice of rectifying deviationdesigning methodconstruction procedure of preloading underpinning pile jacking monitoring and controlling are introduced in derail difficult factors and corresponding problems during jacking construction are provided. After 3-day jack-up constructionthe inclination ratio of building is steady at 0.53 and settlement rate is less than 0.007 7 mm per day and tends to be stable. After five years regular service it can be concluded that preloading underpinning pile is feasible to reinforce or rectify similar structures and project in loess

文档评论(0)

ctuorn0371 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档