- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现场调查记录单(Field survey record sheet)
现场调查记录单(Field survey record sheet)
Team building and lean production combine and improve each other
Visit the Dragon assembly production site experience
In order to better learn the advanced management of team management and lean production in other enterprises
Test, and then in my companys internal, purposeful, planned to start,
October 19
On the 4th, in the third ring quality department Joe manager under the organization,
I am with the manufacturing department, the manager and representatives of each branch company, seven people, the Shenlong total assembly plant S2 line visit study,
And on difficult problems and
S2
Line
I always think that the following aspects are worth our learning and learning:
A location management and identification:
One
,
Each office,
Room toilet doors are posting set room management map,
Name of the person in charge.
Two
The trash, posted on the responsibility at the same time, down to the day and night shifts.
Three
,
The cleaning supplies of all teams and groups are stored centrally and shelves are managed,
And reserves the location and quantity.
Four
The storage boxes for unqualified items include the stands, which are marked red.
Two. Station apparatus:
One
,
The production site has virtually no visible shelf before,
Cart and large turnover capacity
All the stations are made by themselves
PC
The tube holder does not look very large
Neat,
But because of the characteristics of different stations and ergonomics design,
So very
The utility model has the advantages of convenience, practicability and high safety.
Two
The storage rack of the workpiece is designed with high and low levels, and the lower axle at the same time has been fully tested during the design
Storage quantity,
Production rhythm and logistics distribution,
Therefore, the manpower saving in each station is the same
The inventory is strictly controlled while the first in first out is guaranteed.
Three
The working area of the station tools and tools shall be established as re
您可能关注的文档
- 物流企业的借鉴(Reference of logistics enterprises).doc
- 物流公司排行(Logistics company ranking).doc
- 物流现状(Logistics status).doc
- 物流术语英文简称(Logistics terminology English abbreviation).doc
- 物化(Materialized).doc
- 燃气灶具常见咨询问答(Gas cooker common consultation question and answer).doc
- 物流管理在医院物流中的作用(The role of logistics management in hospital logistics).doc
- 牛奶优势区域发展规划(Milk advantage regional development plan).doc
- 物流信息复习资料(Review information of logistics information).doc
- 物流管理就业方向(Logistics management, employment direction).doc
最近下载
- 日立电梯HGE3客梯电气原理图电气规格表K3400003.pdf
- 脑卒中后抑郁.ppt VIP
- 旋转阀ACCS操作法汇.doc
- 《醉翁亭记》三年中考考试题(含答案析)-备战中考语文课内文言文知识点梳理+三年考试题训练(部编版).docx
- 2.3 周而复始的循环第一课时教学课件 教科版(2019)高中信息技术必修1.pptx VIP
- 精品解析:北京市中国人民大学附属中学2021-2022学年九年级上学期10月月考物理试题(原卷版).docx VIP
- 血液透析并发症心力衰竭ppt.pptx
- 2024年秋季中国石油大庆油田有限责任公司高校毕业生招聘630人备考试题及答案解析.docx
- 围术期伴发的精神障碍的预防.pptx VIP
- AD5791_cn 中文说明书.pdf
文档评论(0)