- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现场考试(examination on the spot)
现场考试(examination on the spot)
Field examination outline
First, the process and principle (15 points):
1. brief introduction of expander system process.
Brief introduction of system flow of 2. oil station
Brief introduction of 3. meter station system process
Two, normal operation (15 points):
1. adjustment of cooling capacity of expansion mechanism.
2. On-Site Extraction of three automatic valves, two manual valves to check the valve, valve position, stroke position confirmation.
3. tank pressurization, pressure relief operation
Three, drive operation (15)
1. prepare the preparation before the expander starts
How does the 2. oil station start?.
3. start of instrument compression station.
4. pre cooling operation of liquid oxygen pump before starting.
Four. Parking operation (25)
1. stop operation of expander.
2. stop operation of instrument compressor
3. the heating operation of the expander.
4. heating and defrosting operation of liquid oxygen pump.
Five, accident treatment: (30)
1. emergency handling of safety valve for liquid oxygen storage tank
2. emergency operation of power failure unit
3. system without water, emergency operation of the system
A brief introduction to the flow chart of expander system.
The booster compressor and by pumping pressurized air after cooling, (flow 54000Nm3/h, pressure 2.71MPa.G) into the supercharger driven by the expansion machine, consumed by expander output energy, so that the air pressure can be further improved, pressurized air into the compressor after cooler, to a required temperature after cooling into high pressure heat exchanger by reflux liquid oxygen, nitrogen and cooled to a certain temperature after entering the turbine expansion, expansion into the air under the column.
An emergency shut-off valve is arranged in the expander inlet, when the unit is in danger, according to the danger point signal interlocking, the valve can be closed in a very short period of time, to cut off the gas source, the quick stop, play a secu
您可能关注的文档
- 物流企业的借鉴(Reference of logistics enterprises).doc
- 物流公司排行(Logistics company ranking).doc
- 物流现状(Logistics status).doc
- 物流术语英文简称(Logistics terminology English abbreviation).doc
- 物化(Materialized).doc
- 燃气灶具常见咨询问答(Gas cooker common consultation question and answer).doc
- 物流管理在医院物流中的作用(The role of logistics management in hospital logistics).doc
- 牛奶优势区域发展规划(Milk advantage regional development plan).doc
- 物流信息复习资料(Review information of logistics information).doc
- 物流管理就业方向(Logistics management, employment direction).doc
文档评论(0)