电缆头做法(Cable head practice) 1 range This process standard is suitable for the installation and installation of indoor PVC insulated PVC sheath and power cable terminal under 0.6/1kV. 2 construction preparation 2.1 material requirements: 2.1.1 cable terminations, plastic belts, wiring noses, galvanized screws, Vaseline cables, cable clips, cable signs, copper wires and other materials must comply with the design requirements, and have the product pass certificate. 2.1.2 plastic belt should be yellow, green, red, black four colors, all kinds of screws and galvanized parts should be galvanized well. 2.1.3 ground wire is made of bare copper flexible wire or multi stranded copper wire. The surface of 25mm2 above 16mm2150 No. 120 should be clean and without strand break. 2.2 main machines and tools: 2.2.1 production and installation tools: crimping pliers, wrenches, hacksaw, file. 2.2.2 test instruments: steel tape measure, shake watch, multimeter, test bell. 2.3 construction conditions: 2.3.1 electrical equipment has been installed and indoor air is dry. 2.3.2 cable laying and finishing, check correct. 2.3.3 cable bracket and cable terminal head mounting bracket are complete. The 2.3.4 site has adequate lighting and spacious operating areas. 3 operation process 3.1 process: Shake the cable insulation: peel off the cable armour, clip the welding wire, the wrapping cable, the sleeve cable, the terminal head, the pressure cable core, the connection nose, and the equipment connection 3.2 shake the cable insulation: 3.2.1 uses 1000V shake meter to test the cable, and the insulation resistance should be above 10M. After the 3.2.2 cable has been measured, the core wires shall be discharged to ground respectively. 3.3 strip off wire armour and clip: 3.3.1 according to the specific dimensions of the cables and equipment, measure the cables and mark them. Cut off the excess cable, cable head size according to requirements, except sheath stripping. The sizes of cable hoods are shown

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档