挖孔灌注桩工艺标准(Bored pile; process standard)
挖孔灌注桩工艺标准(Bored pile; process standard)
Construction technology standard of cast-in-place bored pile
1. materials?
(1) cement: should use 425# general silicon or slag cement, and have factory qualification certificate and test report. ?
(2) sand: medium sand, mud content is not greater than 3%. ?
(3) stones: gravel, particle size of 10-15mm, mud content is not greater than 2%. ?
(4) steel bars: all varieties and specifications comply with the design requirements, and have factory qualification certificate and test report. ?
(5) cushion block: use 1:2.5 cement mortar, vein 18-22, fire wire, prefabricated in advance. ?
(6) admixture: admixture, according to the construction needs, and through the test to determine. ?
2. working conditions?
(1) construction site must do three links and one leveling, and in accordance with the site conditions, conditional first do the ground concrete cushion, in order to facilitate construction. A drainage ditch and a water collecting well shall be provided around the site, and the water in the pile hole shall be drawn out and discharged into the sewer after precipitation. Excavation route shall be clear at construction site. ?
(2) according to the construction drawings, accurately line, release the pile center line and the pile diameter, and carry on the technical review earnestly, after the related department carries on the visa procedure, can excavate the pile body earthwork. ?
(3) before digging the pile, four center points of the pile should be extracted from the center of the pile to the four sides of the pile, and it is calibrated with a firm stake. ?
(4)? Before construction, construction site is responsible for technology and construction workers should be comprehensive inspection by hole construction preparation, step by step the safety measures and safety education, safety management, to make the technology implemented in thought, organization, measures. ?
(5) the person is responsible for the record of the vertical center li
您可能关注的文档
- 投标人资格要求(Bidder qualification requirements).doc
- 抗衰老化妆品产品排行榜前十名(Top ten list of anti-aging cosmetics products).doc
- 抗衰老食物(Anti-aging food).doc
- 抗过敏中药治疗变应性鼻炎(Treatment of allergic rhinitis with antiallergic traditional Chinese Medicine).doc
- 抗高血压药--沙坦类(Antihypertensive drugs, losartan).doc
- 折弯系数、k因子(Bending factor and K factor).doc
- 抚州公交路线(Fuzhou bus route).doc
- 抗菌药的合理使用(Rational use of antibacterial drugs).doc
- 折返镜头(mirror lens).doc
- 抗感染药物使用基本原则(Basic principles for the use of anti infective agents).doc
文档评论(0)