挖孔灌注桩工艺标准(Bored pile; process standard).doc

挖孔灌注桩工艺标准(Bored pile; process standard).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
挖孔灌注桩工艺标准(Bored pile; process standard)

挖孔灌注桩工艺标准(Bored pile; process standard) Construction technology standard of cast-in-place bored pile 1. materials? (1) cement: should use 425# general silicon or slag cement, and have factory qualification certificate and test report. ? (2) sand: medium sand, mud content is not greater than 3%. ? (3) stones: gravel, particle size of 10-15mm, mud content is not greater than 2%. ? (4) steel bars: all varieties and specifications comply with the design requirements, and have factory qualification certificate and test report. ? (5) cushion block: use 1:2.5 cement mortar, vein 18-22, fire wire, prefabricated in advance. ? (6) admixture: admixture, according to the construction needs, and through the test to determine. ? 2. working conditions? (1) construction site must do three links and one leveling, and in accordance with the site conditions, conditional first do the ground concrete cushion, in order to facilitate construction. A drainage ditch and a water collecting well shall be provided around the site, and the water in the pile hole shall be drawn out and discharged into the sewer after precipitation. Excavation route shall be clear at construction site. ? (2) according to the construction drawings, accurately line, release the pile center line and the pile diameter, and carry on the technical review earnestly, after the related department carries on the visa procedure, can excavate the pile body earthwork. ? (3) before digging the pile, four center points of the pile should be extracted from the center of the pile to the four sides of the pile, and it is calibrated with a firm stake. ? (4)? Before construction, construction site is responsible for technology and construction workers should be comprehensive inspection by hole construction preparation, step by step the safety measures and safety education, safety management, to make the technology implemented in thought, organization, measures. ? (5) the person is responsible for the record of the vertical center li

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档