木模板(含竹胶合板)安装与拆除(Installation and removal of wood formwork (including bamboo plywood)).docVIP
- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
木模板(含竹胶合板)安装与拆除(Installation and removal of wood formwork (including bamboo plywood))
木模板(含竹胶合板)安装与拆除(Installation and removal of wood formwork (including bamboo plywood))
Compilation according to concrete structure quality acceptance specification GB50204-2002, in which the bold part of the mandatory provisions, must be strictly enforced. I. construction preparation
1. materials
(1) wood formwork (or bamboo plywood): its specifications and types must meet the requirements of construction codes.
(2): wood wood brace specifications, types of template must comply with the design requirements.
(3) support system: wood frame or various shaped truss, pillar, holder, fixture, bolt, gabled frame, cross bracing, steel etc..
2. operating conditions
(1) template design has been completed, there are template design drawings.
(2) preparation: wood template template number should be divided according to the template design and construction scheme of node water section, comprehensive consideration, reasonably determine the number of configuration templates.
(3) mould coating, mould releasing agent and stacking.
(4) according to the requirements of the drawing, place the axis and template edge line, and set the level control level.
(5) the wall and column rebar tube and embedded parts have been finished, hydropower installation, tied reinforced protective cushion block, and through covert acceptance procedures.
Two, operation process
1. column template
(1) making column side according to the size of the drawing template (Note: the lateral plate width to increase two times inside the template thickness) on line position, nail presser plate and then install the template, two vertical and inclined top bracing, perpendicularity and column diagonal correction.
(2): installation of column hoop hoop column should be selected according to the design of column die size and the lateral pressure of such factors as size (wood, wood and steel hoop hoop hoops, etc.), the column hoop spacing is about 500mm, the column section should be set up in the larger column through screw. D
您可能关注的文档
- 最详细的cad各种尺寸(The most detailed CAD sizes are available).doc
- 最详细的日本料理介绍资料(The most detailed information about Japanese cuisine).doc
- 最近更新(Recent updates).doc
- 最近的新闻评论136(Recent news review 136).doc
- 最近的新闻评论158(Recent news review 158).doc
- 最近的新闻评论37(Recent news review 37).doc
- 最全面的风光摄影技巧(The most comprehensive scenery photography skills).doc
- 最精辟的建筑行业汇总(The most incisive summary of the construction industry).doc
- 最新面包减肥法(The latest bread diet).doc
- 最重要的sns网站推广方法(The most important SNS website promotion method).doc
文档评论(0)