构建和谐工地 推动项目管理(Building a harmonious site to promote project management).docVIP

构建和谐工地 推动项目管理(Building a harmonious site to promote project management).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
构建和谐工地 推动项目管理(Building a harmonious site to promote project management)

构建和谐工地 推动项目管理(Building a harmonious site to promote project management) As the economic cell and the main part of market economy, enterprises are inseparable from the construction of a harmonious society in their existence and development, and the construction of a harmonious society can not be separated from the harmonious construction of enterprises. Construction enterprises are based on the project site, and the construction of harmonious construction enterprises must begin with the construction of a harmonious construction site, and make the construction of the site harmonious, so as to form a harmonious whole construction enterprise. Building a harmonious site to promote project management - 2 project of phase I project of source river water plant Zhang Lei, Tang Xiongxing, Zhu Jie, Chen Shaojun The first phase of the project by the Shanghai river water source factory 2 tunnel engineering Limited by Share Ltd construction, construction scope of the project mainly includes: flocculation sedimentation tank, sand filter, sand filter washing lifting pump, contact tank - clear water tank, suction well, two pump, dosing room and the medicine storage tank, 35KV substation, waste water regulating pond concentrated pool balance tank, sludge dewatering room, water pump room and distribution room, while the pool, sludge water regulating tank, inclined plate thickening tank, guard, mechanical and electrical equipment installation engineering, outdoor engineering. The scale of the first phase project is 300 thousand cubic meters per day. Quality objectives: to ensure a one-time acceptance, a Shanghai municipal gold medal. Progress objective: December 31, 2009 delivery. Safe and civilized construction target: safety, no accident, level bureau, civilized site. Management difficulties and priorities 1, management focus In order to create a harmonious site as a starting point and a breakthrough, people-oriented, to improve the living conditions of migrant workers material at th

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档