谈论地下室后浇带设置与施工技术探讨(Discussion on setting and construction technology of back pouring belt in basement).doc
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
谈论地下室后浇带设置与施工技术探讨(Discussion on setting and construction technology of back pouring belt in basement)
谈论地下室后浇带设置与施工技术探讨(Discussion on setting and construction technology of back pouring belt in basement)
Discussion on setting and construction technology of back pouring belt in basement
1, the basement of the high-rise building engineering pouring belt is a key part in the project, the construction process of building can be seen in the basement of building elevation after the construction of the pouring belt must be according to the design, specification and engineering practice, a reasonable set of post pouring belt position. Therefore, it is necessary to plan the construction of the basement after pouring, so as to reduce the difficulty of the construction of the post pouring belt, solve the problems and problems that have puzzled the construction staff for a long time, and guarantee the quality control of the construction of the post pouring belt.
2. General situation of Engineering
Huangling Mining Group, single apartment building and canteen project, a total construction area of 27715.3m2, 25132.7m2 on the ground, underground 2582.6m2, building area 2582.6m2. Among them, the single apartment on the ground floor 18, the ground floor, high 66.9m, beam raft foundation, foundation buried -6.5m; staff canteen 2 floors underground, 1 floors underground, height 9.3m, independent foundation, the base is deep -6.5m.
The basement of the engineering floor with a thickness of 60cm and C35, P6 impermeable concrete, 30cm, C40, P6 wall impermeability of concrete, the basement roof is 45cm thick C35 and P6 impermeability of concrete, flat shape . The basement of the bottom plate, side walls and roof are set and two after pouring, pouring belt width is 1000mm and the position of the 1 axis and 5-6 axis of the cruciform set, after pouring the total length of a total of about 700m, with the thickness of girder thick. The reinforcing bars of the bottom plate and the top pull are double sides and a steel mesh plate is arranged in the middle. The reinforcement of the post pouring zo
您可能关注的文档
- 论文11(Thesis 11).doc
- 论文传统电视媒体网络视听节目的传播特征探析(Discussion on the transmission characteristics of traditional TV media network audio-visual programs).doc
- 论文前言的写法_刻骨铭心_百度空间.doc
- 论文封面书脊(The cover of the spine).doc
- 论太阳能技术(Solar energy technology).doc
- 论文我的成长经历(My growth experience).doc
- 论文格式-医学论文书写格式(Format of medical papers).doc
- 论平衡计分卡在学校管理中的运用(On the application of Balanced Scorecard in school management).doc
- 论文格式-医学论文标题的结构形式(Format of papers - the structure of titles of medical papers).doc
- 论建国后党对非公有制经济的认识与政策转换(On the party's understanding and policy transformation of the non-public sectors of economy after the founding of the people's Republic of China).doc
最近下载
- 2024-2030年中国六氟磷酸锂行业市场现状供需分析及投资评估规划分析研究报告.docx
- 防护工程之三维网植被护坡(附施工图解、工艺、造价编制).pdf VIP
- 《中铁一局集团有限公司工程项目管理绩效考核办法》(中铁一成本[2015]623号).doc
- 机械打眼开炸石方(附施工图解、造价编制).pdf VIP
- 路基土石方(借土填方)(附施工图解、工艺、造价编制).pdf VIP
- 2023扬州龙川控股集团有限责任公司招聘试题及答案解析.docx
- 交通安全设施之交通标志(附施工图解、工艺、造价编制).pdf VIP
- 路基土石方之填挖交界(附施工图解、工艺、造价编制).pdf VIP
- 2纵横造价实战--抛石挤淤附施工图解、工艺、造价编制.pdf
- 2024《我的阿勒泰》作品简介PPT课件(精品).pptx
文档评论(0)