- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目投资与评估-在线作业_a(Project investment and evaluation - online homework _a)
项目投资与评估-在线作业_a(Project investment and evaluation - online homework _a)
OTS online examination system: welcome to W320902141132 | exit system of online homework
Achievement management
Online homework
Ongoing, 0 overdue performance details
Serial number, time, status, view
12014-08-22 23:17:26100.0 ends
Return
Project investment and evaluation - online homework _A user name: W320902141132 final score: 100, a single choice question 1.
Because the purpose of project evaluation is to provide (), it can be said that project evaluation is more authoritative than feasibility study. Decision basis
Technical regulation
Loan program
Feasibility plan
Subject matter: 5
User score: 5
User answer: decision making basis
Knowledge: 1.3. Relationship between project evaluation and feasibility study
Two
The rate of return on equity is () the ratio. Net profit and sales income
Profit and net assets
Net profit and average owners equity
Net profit and total assets
Subject matter: 5
User score: 5
User answers: net profit and average owners equity
Knowledge points: 2.4 borrower profitability analysis
Three
The total assets turnover is divided by the net sales income. Average assets
net fixed assets
Average balance of assets
Net assets
Subject matter: 5
User score: 5
User answer: average total assets
Knowledge: 2.5 borrower operating capacity analysis
Four
The current ratio is () the ratio. Total current assets and liabilities
Current assets and total assets
Current assets and current liabilities
Current assets and fixed assets
Subject matter: 5
User score: 5
User answers: current assets and current liabilities
Knowledge: 2.6 borrower solvency analysis
Five
The scale effect curve method is a method for obtaining an enterprise.
Optimal production scale
Minimum construction time
Minimum cost
Top selling income
Subject matter: 5
User score: 5
User answer: optimal production scale
Knowledge point: 3.4 project production scale analysis
Six
The basic features of a typical survey are at the time o
您可能关注的文档
- 院外急救人员的预备知识(Preparation knowledge of emergency personnel outside the hospital).doc
- 除尘设备的分类(Classification of dust removal equipment).doc
- 除恐灾患经(In addition to the fear of disaster.).doc
- 除湿机应该如何的保养(How should the dehumidifier be maintained).doc
- 除法1-6(Division 1-6).doc
- 除草剂返青(Herbicide green).doc
- 除颤仪的操作程序(Procedures for the operation of an defibrillator).doc
- 陶瓷业务员该怎样开辟市场(How should the ceramic salesman open up the market).doc
- 陶瓷照片技术(Ceramic photo technology).doc
- 除颤仪(Defibrillator).doc
- 音标发音方法(Phonetic transcription method).doc
- 项目安全总监岗位职责和安全职责(Job responsibilities and safety responsibilities of project safety director).doc
- 项目投资与评估-在线作业_b(Project investment and evaluation - online homework _b).doc
- 项目投资与评估-在线作业_c(Project investment and evaluation - online homework _c).doc
- 项目管理与评估—在线作业_a 最终成绩100.0(Project management and evaluation online homework _a final score 100).doc
- 音标发音(Phonetic transcription).doc
- 项目经理部管理体系(Project manager department management system).doc
- 项目计划书 范文(Project plan).doc
- 项目实施的问题与解决(Problems and solutions in project implementation).doc
- 项链 the necklace 中英文逐行对照(项链项链中英文逐行对照).doc
文档评论(0)