汽轮机超速试验(Turbine overspeed test).docVIP

汽轮机超速试验(Turbine overspeed test).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
汽轮机超速试验(Turbine overspeed test)

汽轮机超速试验(Turbine overspeed test) 1.2.3 flying hammer emergency safety device overspeed test 1.2.3.1 test condition: (1) after installation or overhaul of the unit. (2) the unit has been running continuously for 6 months. (3) after the disintegration or adjustment of the flying hammer type emergency protector. (4) before load rejection test. (5) after a months shutdown, start again. (6) after carrying out the generator with 10% rated load for 4 consecutive hours (the main steam superheat should be greater than 80 degrees Celsius). (7) before the test in emergency stop device, automatic main steam valve, control valve action quick, tight closure. (8) DEH works normally; (9) the vibration of the unit is normal, and the axial displacement and differential expansion are normal. (10) electric overspeed 109% protection test is qualified. (11) reheat steam temperature and vacuum are normal. (12) contact thermal engineering to remove turbine trip -MFT protection in boiler FSSS system. (13) removal of DEHs OPC and ETS overspeed protection function. (14) when test, the main steam pressure is 6.0Mpa, the main steam temperature is 4500C. 1.2.3.2 safety measures: (1) the speed of the flying hammer type emergency safety device shall be 3300-3360 r/min, the test shall be conducted two times, and the speed difference of the two movements shall not exceed 0.6%n0, and the reset speed shall be higher than the working speed of about 50 r/min. (2) the speed of the unit is up to 3360r/min, while the hammer type emergency protector is not operating. It should be stopped immediately. (3) the test switch is cut to the mechanical overspeed position on the DEH disk. (4) the unit is broken out and shall be completed within 30 min. (5) in the test, if the regulating valve is large shaking, it should stop the brake. (6) the fluctuation of the main steam temperature during the test is prohibited. (7) during the test, special personnel should be required to monitor the vibration, axial displacement

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档