理石、花岗石地面施工工艺标准(Construction standards of stone and granite ground).docVIP

理石、花岗石地面施工工艺标准(Construction standards of stone and granite ground).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
理石、花岗石地面施工工艺标准(Construction standards of stone and granite ground)

理石、花岗石地面施工工艺标准(Construction standards of stone and granite ground) Marble and granite ground construction process standards I. construction preparation 1. materials and main equipment 1) natural marble, granite varieties, specifications should comply with the design requirements, technical level, gloss and appearance quality requirements, should comply with national standards , natural marble building board granite building plate provisions. 2) cement: Portland cement, ordinary portland cement or slag silicate cement, the label should not be less than 425. White cement: white portland cement, its label is no less than 425. 3) sand: medium sand or coarse sand, its mud content should not be greater than 3%. 4) mineral pigments (for seams), wax, oxalic acid. The main equipment: 5) by foot, shovels, buckets, trowel, ink, steel tape, nylon line, rubber hammer (or wooden hammer), grinding machine. 2. operating conditions 1) after the marble and granite plates come into play, they should be piled side by side in the interior, with the opposite sides of the surface and the back cushion loose. Check in detail whether the varieties, specifications and quantities meet the design requirements, and shall be eliminated when there are cracks, missing edges, falling angles, warping and surface defects. 2) indoor plastering (including standing doors), floor mats, pipes embedded in the cushion and pipelines through the ground have been completed. 3) room, wall, wall, +50cm horizontal line. 4) the construction operation before drawing construction drawing laying marble floor. 5) the operation temperature shall not be lower than 5 degrees during construction in winter. Two, operation process 1. process Preparation work: test, test, test, test, arrange, test, arrange, cement, mortar and mortar 2. preparation 1) in the construction of a large drawing and single processing as the basis, be familiar with the size of each part and practice, to ascertain the relationship between the hole and

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档