- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
脚手架施工方案(Scaffolding construction program)
脚手架施工方案(Scaffolding construction program)
7.4 safety precautions
Safety measures for erection of 7.4.1 scaffold
7.4.1 anyone who has high blood pressure, heart disease, epilepsy, dizzy height, or insufficient eyesight is unfit to do high altitude work, and shall not engage in scaffolding work.
7.4.2 scaffold workers must undergo professional training and obtain the job qualification certificate. Undocumented personnel may not engage in scaffolding operations.
7.4.3 with the scaffolder apprentice, must pass through the physical examination of qualified medical departments before training. Operation must have a licensed skilled worker to guide and guide. From low to high, increasing gradually, shall not arbitrarily scaffold operation. Safety education should be conducted regularly. And regular physical examination.
7.4.4. scaffolding before construction, and must formulate construction plans and technical disclosure (both sides signed the procedure). For large special-shaped scaffolding, and should be reported to the higher authorities for approval. Technical clarification to all operators.
After accepting the task, the 7.4.5 operation team must discuss and determine the method of support according to the characteristics and requirements of the task. A clear division of labor, in the beginning of operation, the team leader and security staff should be in the construction environment and the necessary protective equipment to do a check, eliminate hidden dangers can be carried out before the operation.
7.4.6 scaffolds must wear safety belts when working above (above 2m). The wrench should 2m board bolt rope. The safety belt must be fastened with vertical bar, has a good, not hanging on the wire or other unstable place. Not through the file (i.e. in a smooth rod does not help anything to walk). Do not jump scaffold, operate on scaffolding, concentrate, prohibit slapstick and jokes. Rest should be scaffolding, prohibited drunk operation.
7.4.7 in case of bad weather (such
您可能关注的文档
- 各种范文都有,到时不用找了,被收藏了十几万次了(All kinds of essays have, when not to find, and has been collected more than ten thousand times).doc
- 各种鱼的做法(A variety of fish practices).doc
- 各类会计科目(Various accounting subjects).doc
- 各种进制的转换(计算机基础呀)(Various decimal conversions (Computer Fundamentals)).doc
- 各种进制的转换(计算机基础呀.)(Various decimal conversions (Computer Fundamentals)).doc
- 各类地板质量鉴别方法(Different floor quality identification methods).doc
- 古绵纯如何用巧劲成就大品牌(How old Mianchun Jin Qiao brand achievement).doc
- 各行业人才短缺急煞用人企业(Shortage of talents in all trades and enterprises).doc
- 各项指标(Each index).doc
- 各行业工资参考表(Payroll sheet).doc
文档评论(0)