- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌浆作业指导书(Drilling grouting operation instruction book)
钻孔灌浆作业指导书(Drilling grouting operation instruction book)
Drilling grouting operation instruction book
This article is contributed by leexp988
Drilling grouting operation instruction book
Drilling grouting construction process flow diagram 1, drilling grouting construction process flow diagram, 1.1 drilling construction process flow chart, operation preparation
Hole location and lofting
Rig installation location
Open hole drilling
Buried orifice pipe
drill
enter
take
core
Core logging and storage
punching
wash
Final hole acceptance
One
1.2 grouting construction process diagram drilling (section)
Washing and measuring Kong Shen
Lower grouting plug
Fissure irrigation
Water pressure test
irrigation
slurry
Mixing cement slurry
Drill down for a while
Grouting end hole sealing hole: This diagram shows the top-down grouting method of construction process. 2, operation methods and requirements for drilling grouting must also meet the following conditions for construction: a lift deformation observation device parts will lift deformation observation device is installed and can carry out normal test; geophysical prospecting hole test site, test work must be completed before irrigation.
Two
2.1 2.1.1 drilling hole position measurement lofting: according to design drawings, put holes, holes: measured by professionals with red paint or stakes (Gang Qian) mark, and the construction technical personnel to the operation staff work, the deviation of hole position is controlled within the permissible range. 2.1.2 rig installation location personnel must be rig stable installation, the school opened a hole before the upright shaft angle, to ensure accurate hole, hole deviation value should be controlled within the permissible range. 2.1.3 orifice pipe laying: according to the design requirements of the laying of the orifice pipe, the hole pipe direction must be consistent with the design hole. 2.1.4: when using long drilling drilling diameter drill, workers should be a reasonable select
您可能关注的文档
- 英语固定搭配(English regular collocation).doc
- 英语国家概况之 英国 翻译(English translation of English speaking countries).doc
- 英语四级考试大纲及评分(Syllabus and grading for CET four).doc
- 英语国家概况(Overview of English speaking countries).doc
- 英语四级评分细则(English four scoring rules).doc
- 英语基本句式(Basic sentence patterns in English).doc
- 英语基础知识学习(Basic knowledge learning in English).doc
- 英语四级阅读理解练习含答案1(English level Four reading comprehension exercises include answer 1).doc
- 英语基础(English foundation).doc
- 英语字母(超好用、免费)(English alphabet (super easy to use, free of charge)).doc
- 钢结构卷内目录(Catalogue of steel structures in rolls).doc
- 钢筋加工制作(Reinforcement fabrication).doc
- 钻孔灌注桩基础主要质量问题分析及处理办法(Analysis and treatment of main quality problems of bored pile foundation).doc
- 铁道(railway).doc
- 铁路(Railway).doc
- 铝合金的牌号和成分对应表(Table 1 grade and composition of aluminium alloy).doc
- 铝合金常用资料(Common data for aluminum alloy).doc
- 铅笔的故事(The story of pencils).doc
- 银行从业资格(Banking qualification).doc
- 银行优质服务演讲稿(Bank quality service speech).doc
文档评论(0)