砖混、外砖内模结构构造柱、圈梁、板缝钢筋绑扎工艺标准(407-1996)(The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996)).docVIP

砖混、外砖内模结构构造柱、圈梁、板缝钢筋绑扎工艺标准(407-1996)(The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砖混、外砖内模结构构造柱、圈梁、板缝钢筋绑扎工艺标准(407-1996)(The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996))

砖混、外砖内模结构构造柱、圈梁、板缝钢筋绑扎工艺标准(407-1996)(The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996)) The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996).Txt The brick, brick outside the internal model structure column and ring beam, slab steel banding process standards (407-1996) Range This technology is applicable to masonry structure, brick outside the internal model structure column and ring beam, slab steel banding process. Construction preparation 2.1 materials and main equipment: 2.1.1 steel: there should be factory certification, according to the provisions of mechanical performance re examination, when the process of adding brittle fracture and other special circumstances, you need to do chemical composition test. The reinforcement shall be free of old rust and grease. 2.1.2 iron wire. Use wire No. 20~22 (fire wire) or galvanized wire (Qian Si). 2.1.3 mortar block and plastic card for controlling concrete protective layer. 2.1.4 tools: steel hook, crowbar, steel frame, steel wire brush board, lashing, trolley, chalk, ruler and other. 2.2 operating conditions: 2.2.1 according to the site plan of the site plan, the steel stacking site for cleaning and leveling, ready to pad. Stacked according to different specifications and pads. 2.2.2 check the steel grade, model, shape, size and quantity, whether it is the same as the design drawing and processing list. 2.2.3 can play well the horizontal line and the outer line of the constructional column, the outer brick and the inner concrete wall. 2.2.4 has finished the ring beam and slab template preflighting and mold clean. 2.2.5 the end hole of the prestressed round hole plate has been blocked according to the standard drawing (96G44). Operation process 3.1 reinforcing bars of constructional column: 3.1.1 process flow: Prefabricated structural column, steel bar skeleton, trimming structu

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档