施工组织措施(Construction organization measures).docVIP

施工组织措施(Construction organization measures).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织措施(Construction organization measures)

施工组织措施(Construction organization measures) This article by City Ming Electric Company contribution DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. 110KV store line transmission line reconstruction project 1 Construction measures for construction of power transmission line relocation project of 110KV store line of God line transmission line An outline of the project overview and characteristics of L, the project: Project Overview: this project is built for Shenfu highway to move transmission line change, Qiangai section of the original line of 44#-53# and II back to 43#-52#, modified the Qiangai Duan Xianlu only 1 back to 44#, 45# II 43#, 44# for the single back to back single tower, the rest are two towers, I changed the length of the independent movements of single line of 816 meters, the length of the independent movements II instead of single line of 827 meters, Qiangai length of double circuit line total tower is 1679 meters, Qiangai section line length is 2*1.679+0.816+0.827=5.001 km, sharing 8 Jixinta both, angle, tension tower, the original I and II results back to the 44# back to 43#, double 53# total tower tower tower and satisfy the conditions of use, wire remained unchanged (see list). The LGJ 300/40 type steel cored aluminum conductor is used in the transition section. The safety factor is 2.8, the ground wire is GJ-50 galvanized steel strand, and the safety factor is 3.75. Tower type: the selected towers are selected according to actual conditions. The whole line is erected with iron tower. Selected tower type: corner and tension tower have 7844785078517852, four kinds of tower type. Foundation: this project adopts reinforced concrete cast-in-place column and slab flexible foundation. 2, topography, geology and topography: topography, geology and geomorphology: (1) topography and geomorphology, the line is located in the sand dunes, ditch beam area, a

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档