水电安装及文明施工(Hydropower installation and civilized construction).docVIP

水电安装及文明施工(Hydropower installation and civilized construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电安装及文明施工(Hydropower installation and civilized construction)

水电安装及文明施工(Hydropower installation and civilized construction) The seventh chapter, mechanical equipment installation project I. General Situation of the project The project can be divided into: water supply and drainage works, heating engineering, ventilation and air conditioning works. Two, construction process 1 、 pipe installation Project content: installation of pipe line, support and hanger, dry pipe, vertical pipe installation, branch pipe installation, valve installation, accessory installation, corrosion protection and insulation. Avoid pipeline: water supply, heating pipe for drainage pipes, heating pipes to make water, let the small diameter of large diameter pipeline, pressure piping for non pressure piping, must be reasonable allocation between the various processes, to determine and adjust the project into the pipeline and bracket position. (1) Guan Daosi answers: 1) wire feed pipe. 2) draw lines on the tube and break the line according to the sketch of field mapping. 3) the use of electric threading machine, DN25mm more than two times, long sleeve wire, tube end to pad. 4) pipe thread connection should be between the inside and outside the thread with appropriate packing, generally use white paint, oil hemp silk, also can use raw adhesive tape. 5) install threaded parts, should press the screwing direction once installed, not back. After installation, expose the 2~3 thread and remove the remaining padding. (2) pipe welding 1) when welding pipes, the pipe interface shall clear off rust, dirt and grease. 2) when the steel pipe is cut, its cutting cross section should be perpendicular to the center line of the pipe to ensure the concentricity of the pipe welding. 3) when the pipe wall thickness is above 5mm, the groove shall be cut to ensure full penetration. The groove forming can be used for cutting or welding groove machining, but should be cleared of debris and iron oxide, and with a grinding, until the metal is exposed to light 4) pipe welding, the t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档