- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塑胶跑道(Plastic track)
塑胶跑道(Plastic track)
Plastic track
How to write the construction procedures of the plastic runway?
2010-09-13
To clean the place bottom glue dosing, mixing, paving, defoaming and curing, surface glue dosing, mixing, paving, defoaming, and particles and recovery, glue, latex painting line, measuring detection point line, completed 2, the laying process description:
(1) first of all, to check the smoothness of the base layer, leveling the concave and convex parts (for example, the cement concrete foundation needs pickling).
(2) the bottom rubber laying: before laying the bottom rubber, first clean the foundation and prepare the tools for construction.
A) according to the requirements of the process, measure the location of the construction line and put the construction line in place.
B) starting from the side of laying site according to the site, the width of disposable frictioning.
C) spreading speed is even, in time for the show, concave and convex of glue or scraping.
D) after gluing, inspect the whole floor to ensure the thickness of the covering.
(3) paving of surface adhesive:
A) time interval frictioning when you try to reduce every barrel of glue, the gelation rate is uniform.
B) observe the thickness of the adhesive surface at all times.
(c) scrape the surface glue, sprinkle the red particles before the surface glue is solidified, and clean the excess colloidal particles when it is completely solidified.
D) spraying, to ensure that the particle does not fall off.
(4) process line: according to the current track and field facilities standards, accurately measure the location of the process line, then spray with polyurethane paint.
Plastic runway type
1 、 printing type antiskid plastic runway
First of all, the cement foundation should be waterproof treatment or asphalt foundation for the bottom sealing treatment. The base layer is processed after 24 hours of maintenance can be paved runway bottom, with plastic substrate according to GB doped with 25% 3-4mm in di
您可能关注的文档
- 信长之野望12修改方法(Nobunaga Yukinomi 12 revision method).doc
- 保险术语 3(Insurance terminology 3).doc
- 信阳到-至张家界自驾游路书--自助游路线攻略(Xinyang to Zhangjiajie - to the self driving tour book -- travel route).doc
- 修改电脑的mac地址(Modify the computer's MAC address).doc
- 修改mysql密码的方法(How to modify the MySQL password).doc
- 修补木地板裂缝资料合集(Mending wood floor cracks data collection).doc
- 倚仗动物(Relying on animal).doc
- 做一个智慧班主任(Be a wise head teacher).doc
- 做了一个nrf905的无线射频,为大家提供一个收发一体的程序(Do a nRF905 radio frequency, to provide you with a send and receive procedures).doc
- 做人 做事 交友 看后终生受益(Man, do things, see friends, lifelong benefit).doc
原创力文档


文档评论(0)