开机吹扫方案(Startup purge scheme).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
开机吹扫方案(Startup purge scheme)

开机吹扫方案(Startup purge scheme) 25600m3/h unit Driving, heating, purging plan Start the circulating water pump and air compressor only, and carry out heating and purging on the air separation unit circulating water system 1. air conditioning compressor cooling water backwater valve, regulating the circulating water pump outlet valve and total return valve, the air compressor cooling water flow control is more than 1200m3/h, the total water supply pressure is 330kpa, the total return pressure 210kpa, the total water cycle of more than 2500m3/h. Get ready before driving 1. cooling water inlet and outlet valve is fully open, the interstage cooler is used, the water side is exhausted, the oil level is normal, the oil cooler is used, the oil side and the water side exhaust. 2. start the air compressor auxiliary oil pump, adjust the oil temperature, oil pressure. 3. the instrument gas is fully restored and confirmed that the vanes and emptying valves are in normal operation, and the DCS logic and interlocking adjustment are completed 4. molecular sieve valve check switch location, debugging normal 5. all air blowing valves on the air separation tower are closed and all valves of the system are closed 6. molecular sieve system: turn on V1203, all other valves are closed (molecular sieve is suspended, 1# is running, 2# is heated for 68 minutes) 7. check the air compressor control logic, to meet the boot conditions 8. prepare a flow chart for the heating purge mark 9. electrical professionals confirm that the grid allows for the start of the air compressor 10. professional equipment arranged from V241, V242 valve Start the air compressor 1. check all starting conditions of air compressor: (1) the entrance of a guide vane opening closed (2) two level entrance gateopening closed (3) the vent valve V1046 is fully open; (4) normal oil temperature is greater than 20 degrees centigrade (5) after normal oil pressure (greater than 2.3Bar) 60S; (6) starting interval time (20 minutes) to

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档